Building Bridge Tunnel Formwork and scaffolding system

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Building Bridge&Tunnel Formwork:

A compositional steel formwork system mainly used in the building which has regular structure

without beams, the excellent formwork system can make the integral pouring for the wall & slab

easily achieved.


Characteristics:

◆ No assembling, easy operation with formed formwork.

◆ High stiffness, make perfect shape for concrete.

◆ Repeatedly turnover is available.

◆ Widely applied range, such as building, bridge, tunnel, etc.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Demolition of tunnel bearing formwork for several days
The removal time of concrete wall and beam column pouring template is determined according to the strength of concrete, different situations: different removal time of concrete strength of the bottom die and the bracket removal should meet the following requirements:
Q:I would like to ask the tunnel step method excavation, the height of each step is how to divide?
The side ditch construction using composite steel formwork. (1) the temporary facilities of tunnel construction plan layout: in the single ended due to tunnel entrance, temporary facilities of tunnel construction in tunnel exit to the right. The layout for the layout of wind mechanical equipment in the right side of the roadbed export based on the terrain conditions, reservoir located in the left side from the position of about 80m. In the mechanical approach immediately after the entrance of earth excavation construction, roof slope and drainage ditches slope anchor slope reinforcement, well hole digging for. (2): the excavation and reinforcement the mechanical construction, according to the construction method of Subgrade Earthwork excavation, dig to the rock when, in order to minimize the disturbance of the entrance slope and subgrade slope, must adopt the method of weak blasting and presplitting blasting for excavation. The entrance slope using hang net shotcrete reinforcement, to facilitate the safety hole (3). The excavation and support of the shallow section of the surrounding rock of the cave: the construction method adopts the step method, and the advanced grouting bolt is adopted on the stage
Q:Tunnel construction technology and method
1 overall construction planUsing the new Austrian tunneling method, the construction principle is "less disturbance, early spray anchor, ground measurement, tight closure". The rock excavation method of construction; rock class micro bench excavation, pre splitting blasting; IV surrounding rock by construction method (Section IV surrounding rock under the partial, the construction step method), smooth blasting technique; fault fracture zone by middle wall construction method.The ballast is unloaded by the side unloading loader.Two lining the rail trolley, concrete mixing truck to transport concrete, pumping concrete, lining after decoration engineering construction.It is necessary to strengthen the geological prediction in the fault fracture zone and water rich zone, and provide the basis for the construction.
Q:How to design the general layout of the tunnel construction organization design
I need to contact you to provide a template..
Q:The small side wall of the small side wall and inverted arch in the high speed tunnel
The pouring of inverted arch and the pouring of the short side wall, do not step in place, install the side die on the invert
Q:How to fill in the tunnel template
There seems to be a quality inspection form,Send a template to see
Q:How the tunnel template is calculated
The man's answer is analysis procedure of tunnel structure analysis of finite element modeling.The design of tunnel lining formwork and support must have enough strength, rigidity and stability. The utility model has the advantages of no convex concave, no deviation, no distortion, and the appearance of the concrete is regular and beautiful.
Q:Tunnel construction sequence What is the sequence of construction process
Measuring and setting out the drill hole charge blasting, ventilation, smoke exhaust, water spraying and dust removing, the top of the vertical arch, the anchor rod and the reinforcing steel net, the spraying concrete operation enters the next cycle, and the first branch is stabilized and then the two lining is applied
Q:What grade of concrete used for tunnel cushion
Now the actual project is basically C15, if the economy is less than C15.
Q:Two lining concrete pouring should adopt the combination of steel formwork system and formwork trolley two template system.
Tunnel two lining concrete pouring mould! Template trolley!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range