British Pressed Swivel Coupler for Scaffolding Q235 Q345 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of   British Pressed Swivel Coupler  for Scaffolding

  • Material :SPHC

  • Production Standard :BS1139 EN74

  • Applications :Construction

  • Package :In bag and pallet



  • British Pressed Swivel Coupler  for Scaffolding Q235 Q345 CNBM

  • British Pressed Swivel Coupler  for Scaffolding Q235 Q345 CNBM

  • British Pressed Swivel Coupler  for Scaffolding Q235 Q345 CNBM

Futures of  British Pressed Swivel Coupler for Scaffolding

Scaffolding coupler is the connecting hardware between the steel rail and rail bearing.

  • The Couplers are used to fix the steel rail on rail bearing to keep the rail gauge and prevent their opposite vertical and horizontal movements.

  • The good scaffolding couplers always consider design with less coupler system accessories for easy installation & disassembly.

  • Choose the durable & flexible & high strength couplers can firmly connect the steel rail and rail bearing.

  • Especially recommend the flexible couplers for concrete sleeper moulds application due to enough flexibility requirement from concrete sleeper

  • Our scaffolding couplers are with dual anti-rust processing (deactivation & galvanizing) for a longer lifespan compared to the common couplers.

  •  

  • Adapting full steel plate with cold press molding, our scaffolding couplers are with advanced structure design.All scaffolding couplers are with very high strength & toughness much higher than international general coupler standards. They totally eliminated the safe hazard compared to common iron casted couplers which easily cause the safe hazard due to scaffolding system collapsing accidents resulted by coupler fracture.

  • Our scaffolding couplers with superior stability & high load bearing capacity are popularly used in various construction/engineering applications.

  • The low-cost  scaffolding couplers overcome the point & line fitting problems between couplers and tubes due to the Max Joint Area and cause no safe hazard resulted by steel tube slip. Greatly reinforced the mechanical properties & safety to the scaffolding and prolong the couplers lifespan.



  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what is scaffolding in early childhood?
Scaffolding basically means being the support (a scaffold is a support) in the child's learning. A preschooler can do a range of things. He or she will have mastered some things already and there will also be things that are beyond what he or she can do. When playing with the preschooler, you want to make sure that what's going on falls in that range (zone of proximal development). Don't give him or her something that's too easy or too hard to do, but play games that make them think a little and use what he or she already knows to take it a bit further. I hope I'm not confusing you more. In one sentence..scaffolding is supporting the child in learning something new based on what they already can do or know.
Q:Exterior wall scaffold construction plan?
Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
Q:How to do an industrial(Scaffold) piercing without a bend in the ear?
This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Foot plate:(1) scaffold with welded steel sheet with 18# wire fence, bundled in the bar.(2) steel bar appear off, the serious corrosion of the prohibition of the use of.(3) the wire binding must use 18# wire binding, and each steel bar binding plate must be above 4
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:Targus or scaffold piercing?
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q:Could someone please tell me a very simple scaffold on writing commentary?
To know about College and university! log on to alumne.net/

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range