British Pressed Sleeve Coupler for Scaffolding Q235 Q345 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of   British Pressed Sleeve Coupler  for Scaffolding

  • Material :SPHC

  • Production Standard :BS1139 EN74

  • Applications :Construction

  • Package :In bag and pallet




  • British Pressed Sleeve Coupler  for Scaffolding Q235 Q345 CNBM

  • British Pressed Sleeve Coupler  for Scaffolding Q235 Q345 CNBM

  • British Pressed Sleeve Coupler  for Scaffolding Q235 Q345 CNBM

  • Futures of  British Pressed Sleeve Coupler for Scaffolding

    Scaffolding coupler is the connecting hardware between the steel rail and rail bearing.

  • The Couplers are used to fix the steel rail on rail bearing to keep the rail gauge and prevent their opposite vertical and horizontal movements.

  • The good scaffolding couplers always consider design with less coupler system accessories for easy installation & disassembly.

  • Choose the durable & flexible & high strength couplers can firmly connect the steel rail and rail bearing.

  • Especially recommend the flexible couplers for concrete sleeper moulds application due to enough flexibility requirement from concrete sleeper

  • Our scaffolding couplers are with dual anti-rust processing (deactivation & galvanizing) for a longer lifespan compared to the common couplers.

  •  

  • Adapting full steel plate with cold press molding, our scaffolding couplers are with advanced structure design.All scaffolding couplers are with very high strength & toughness much higher than international general coupler standards. They totally eliminated the safe hazard compared to common iron casted couplers which easily cause the safe hazard due to scaffolding system collapsing accidents resulted by coupler fracture.

  • Our scaffolding couplers with superior stability & high load bearing capacity are popularly used in various construction/engineering applications.

  • The low-cost  scaffolding couplers overcome the point & line fitting problems between couplers and tubes due to the Max Joint Area and cause no safe hazard resulted by steel tube slip. Greatly reinforced the mechanical properties & safety to the scaffolding and prolong the couplers lifespan.



  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Getting my scaffold (industrial piercing) done tomorrow. Tips?
You should keep your breathing calm so you don't freak out, haha. If you're very terrified of needles, have one of your friends hold your hand while doing it and talk to them while doing this to keep your mind off of the piercing. It should be done very quickly though, so don't work yourself up too much :)
Q:Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
Q:Scaffold Piercing Aftercare?
i love my scaffold/business piercing i do not imagine it hurts yet some human beings say it does Coast round £25/30 - any more desirable than its a rip off. this is a soreness to heal and takes a lengthy time period! each and every time I knocked mine it swelled and went humorous. extremely stressful. Had it executed 3 cases, 1st time it grew out, second time I only took it out. third time I were given it pierced on my different ear and at the same time as it became healed I replaced it to a versatile bar and for the reason that then this is been suitable. desire I helped.
Q:Scaffolding????
Yep the above is correct .. it's the way people (students) break down and explain certain things... With LOve...x
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:What's the difference between scaffold and industrial piercing?
Theres no difference scaffold is what they call it in like europe, indusstrial is usa
Q:Scaffolding/industrial piercing?
Scaffold/Industrial piercings definately hurt more than a regular lobe piercings because it's in the cartilage area and its pierced at a larger gauge but the pain is bareable. On a scale of 1 to 10 (10 being the worst pain) I would say an Industrial would be anywhere from a 4-6 depending on your pain threshold. Freezing it probably wouldn't be nessesssary. I got a 14g Industrial pierced on one ear and a 16g helix on the other both on the same day (the industrial was done first) and in my opinion the 16g helix hurt more. So it really depends on how well you tolerate pain
Q:Which accessories are included in a movable scaffold
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:When scaffolding is erected on the base of the permanent structural concrete
Selection of the project using 48 mm, 3.5mm wall thickness of steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, such as net feet
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range