Box Girder Steel Template

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

BOX GIRDER

External formwork of 32/24 meters post-tensioning concrete pre-faricated box girder is divided into sliding mode and
rolling mode; the side form of the first mode can move from one bottom form to the other one which increases the
utilization rate, and decrease the investment for the formwork during construction; the side form of the second mode
is relatively fixed according to the bottom form, and could be dismantled by revolving, which improve the efficiency
of formwork closure.The side formwork unit is mainly 6 meters, the design of the sructure is compact
and reasonable with beautiful and smooth appearance.

■  All the edges of ecternal formwork panels for the box girder have been milled, which ensure

the assembly precision to avoid the leakage of the concrete

■  The bottom formwork unit is 3 meters to facilitate the installation and anti-arch adjustment

■  The bulkhead is designed to envelop the sideform,which can be wholely assembled, making the removal, installation and adjustment much easier.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why does the formwork support only three faces?
Only the bottom surface of the beam and the two sides of the board, the above is not to shop template, or how the concrete pouring.The general site is the beam and plate template shop together, the top of the beam and the top elevation of the same plate,
Q:What is a large volume template? How much is the cross section of the beam, belonging to the large volume template?
The above construction total load of more than 10kN/m2, or concentrated line load greater than 15kN/m template support system that belongs to the template, if you do not consider other loads, considering the single weight, according to concrete 25000KG/m3 calculation, then the beam section area of 0.4m2 belongs to the template, such as 400*1000, 300*1350, 500*800 etc.. Central line loads can be calculated in similar ways.
Q:I would like to ask the three sides of the template is calculated on the surface of which is the three?
Generally, there are two kinds of formwork support:Area of contact surface between concrete and formwork
Q:Beam column plate template how to calculate the need to deduct what part?
The second is to calculate the template of the beam to calculate the template of the beam with the section length multiplied by the length of the unit is M2Finally the board notice when calculate the template template amount is peripheral template must take and post together part to deduct the intersection with beam part to be deducted
Q:Rules for calculation of formwork with beam slab
The board side mode *2 is the circumference of the board (minus column protruding part) multiplied by the thickness of the plate 0.1m.
Q:What is the formula of beam slab formwork
The template to be installed to expand into one piece, each piece of the area is
Q:Calculation of beam and column formwork
Tell you a definition, you will understand
Q:What is the area of the overlap between columns and beams, beams and beams!
The connection between the column and the beam and the place where the beam is connected with the beam does not need to be deducted from the area.
Q:How to calculate the beam section size is 200 x 400
Building template:Building template is a temporary support structure is made according to the design requirements, the concrete structure components, according to the position and size of the provisions of forming, maintaining its correct position, external loads and under construction template gravity and acting on the. The purpose of template engineering is to ensure the quality of concrete engineering and construction safety, speed up the construction progress and reduce the cost of the project.This paper introduces the construction formwork structure of cast-in-place concrete structure construction, which is mainly composed of three parts: the panel, the supporting structure and the connecting parts. The panel is in direct contact with the bearing plates of concrete; supporting structure is a temporary structure supporting panel, concrete and construction load, ensure the construction template are firmly combined, do not deform and damage; the connecting piece is connected to the panel and the supporting parts of the whole structure.Building formwork is the concrete pouring forming shell and support, according to the nature of the material can be divided into building template, building wood plywood, covered with plastic board, multilayer board, double-sided adhesive, double-sided coated building template. According to the construction process, the construction formwork can be divided into the cast in place concrete formwork, the pre assembled template, the large formwork, the jump formwork and so on.
Q:How to determine the height of cast in place concrete beam formwork
Span multiplied by 1/1000~3/1000, can not be so precise, the general is probably about two or three cm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range