Big House Led Picture Frame Wall Picture
- Loading Port:
- Ningbo
- Payment Terms:
- T/T
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 15000 Sets pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification:
1. MOQ: 2000 pcs
2. Description:
Hanging on wall for christmas, party pub or house decoration, we can do any picutres you want.
size:W:30cm H:40cm S:2.3cm
Energey: 1.5V 3AAA baterry
materials:plastic(pS)
Function:For decation on christmas or any holiday party decoration.
3.Application:
The picuture hanging on wall for saloon and party, christmas or any other holiday to raise romantic atmosphere
4.Packaging & Delivery :
PACKAGE: 12pcs / carton
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 50 business days for Bulk Orders for Bulk Orders, depends on order quantity.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
5.SERVICE:
we are the real factory.We can offer the good quality and nice service.
As we are real factory, we have the good advantage to control the qualtiy and offer better service to you. Pls do not hesitate to contact if you interest.
- Q:Lighting line connections?
- Series circuit: a circuit consisting of elements connected sequentially.
- Q:What are the energy saving measures for lighting and distribution?
- : limit the application of halogen lamps, only for small expensive goods, such as jewelry, crystal products and other key lighting
- Q:What are some good suggestions for plant energy saving lighting modification?
- The factory is the national advocate energy-saving lighting transformation,
- Q:About the brightness of LED lighting
- LED he's transparent, except for angle astigmatism. Apart from the angle, there is still scattered light.
- Q:What are the main points of power distribution and lighting energy-saving supervision?
- , strictly check the curtain wall energy saving project materials, components, etc., and their varieties and specifications shall comply with the design requirements and relevant standards.
- Q:How to choose lamps and lanterns? Inventory factors affecting consumer spending
- Data: 68% how to choose lighting: the most popular light channels -- how to buy building materials, lamps lighting decoration: the supermarket to buy things, the owners tend to gather enough patience and wisdom, as to our home decoration into the ideal paradise
- Q:LED lighting energy-saving transformation really good?
- LED lighting energy-saving transformation, because the use of LED lamps low power, less power consumption, and LED lamps longer than traditional lamps, can generally save more than 70%.
- Q:Do you want city lighting?
- About city lighting, whether to do this problem, depends on how to understand? City lighting also called night lighting, is referred to as words, he has a lot of classification, such as buildings, squares
- Q:How to use electric car storage battery and energy saving lamp to produce street lamp
- The most important point of using LED is that the supply voltage is stable, and the slightly higher voltage can cause LED damage.
- Q:What is the color temperature of a star hotel?
- The entrance is the transition space into the hotel, the guests need to clearly guide the entrance position, in addition to creating a comfortable visual environment, but also a friendly atmosphere.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Big House Led Picture Frame Wall Picture
- Loading Port:
- Ningbo
- Payment Terms:
- T/T
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 15000 Sets pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products