best selling aluminum air diffusers

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
50000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Square Ceiling Diffusers

Description:

Square Ceiling Diffusers are designed to provide excellent directional performance typically in a 4 way airfow pattern.

The Louvre Face Diffuser is generally flush mounted to the ceiling line. This frame style is extremely versatile and is ideal for a lay-in application where the diffuser is placed into a T-Bar ceiling grid. The Louvre Face Diffuser may be used in place of a modular ceiling tile without any need arising to alter the T-bar construction.

It is easy for installation with its removeble core.

Also it provides options for 1, 2 & 3 way airflow patterns.

Features:

Materials: Aluminium

Construction; Frames have punched in corner, in addition to welded joints.

            Welded blade cores.

Core: Removable with safety cord/ chain under

Color: Standard- RAL 9010 RAL9016 or Anodized

Opposite Blade Damper Optional

Standard Size:

Neck Size 145*145 Face Size 295*295 Height 47.5

Neck Size 220*220 Face Size 370*370 Height 47.5

Neck Size 295*295 Face Size 445*445 Height 47.5

Neck Size 370*370 Face Size 520*520 Height 47.5

Neck Size 445*445 Face Size 595*595 Height 47.5


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Decoration refers to the home improvement part, housing construction is the content of the building
Q:Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q:HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Q:Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q:Ventilation is very good, why still have to install fresh air system
Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q:External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @ .com
Q:Single cold air conditioning function can not change the cold and warm?
External wall insulation should pay attention to what the details?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range