• Best Quality Swivel Scaffolding Swivel Couplers System 1
Best Quality Swivel Scaffolding Swivel Couplers

Best Quality Swivel Scaffolding Swivel Couplers

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
15000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details:

 

Place of Origin:Hebei China

Model Number: GTJ-002

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements

 

Packaging & Delivery:

 

Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.

Delivery Detail: WITH IN 25 DAYS

 

 

1. Product Information

 

Product Name

Japanese Type Swivel Scaffolding Couplers

Type

GTJ-S002

Material

Q235

Thickness

2.5mm or 3mm

Weight

0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951

Dimensions

48.6   x 48.6mm

MOQ

10000PCS

Product feature

anti-rust,   skid proof, high breaking strength

 

 

Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
Mobile scaffolding in general are on the basis of rent by the day
Q:i need as much detail you can give me on these symbols in the book scarlet letter by Nathaniel Hawthorne. if you have any website references besides cliffs notes and spark notes i would greatly appreciate it!!!
I for irritable Good thing we're not traveling around together. We'd get in a heap of trouble, lol
Q:Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q:First of all, is it painful? Obviously it will be painful I know, but is it severe?Also, what cleaning solutions/products do I need to minimise the risk of infections?And what type of bar should I get? I've heard that Bioplast and PTFE allow for better flexibility and therefore quicker healing, but wouldn't a flexible bar lead to mis-alignment on the two pierced holes? If this is so, what types of steel are safe for initial piercings?Thanks c:
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
Q:What issues need to pay attention to the construction of high-level scaffolding
Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
Q:Standard Specification for bowl buckle scaffold
The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
Q:Scaffold removal should comply with those requirements......
3 removal of safety technical measures should be made clear to each operator. 4 removal of the scaffolding materials, debris and ground obstacles, and will be affected by the mechanical and electrical equipment and other pipelines, such as removal or protection.
Q:Please help me in building professional people (scaffolding)
Ordinary scaffolding is a variety of length of steel pipe and direct, cross buckle, three kinds of fastenerClimbing scaffolding is the use of steel or steel beams to do the platform, and above the same as ordinary scaffolding
Q:i already found the force in rope 2 but im not getting the force in rope 1.
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:What does Scaffolding mean in the educational talk?
Yep the above is correct .. it's the way people (students) break down and explain certain things... With LOve...x

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords