Best Prices Cup Lock Scaffolding From China

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Not easy to lose fastener, portable firm and easy to maintain and transport

3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

1.GREAT REPUTATION CUP LOCK SCAFFOLDING

2.Three Year Warranty



3.Operating Friendly


4.Full Safety Devices


5.Provide OEM service


6.Reasonable price

 

5.   FAQ of Cup-lock Scaffolding

1) What promises can be done by us?

   . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 3) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  



 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of scaffolding
Collapse is the biggest hidden danger scaffolding. Countermeasures to prevent and prevent the collapse of the scaffold: 1 must not be "empirical" in the daily enterprise construction process, some enterprises use "empiricism", do not carry out specific accounting. Timberman no license, is still "empiricism", scaffolding system does not have a scientific guarantee, the collapse is inevitable. For steel scaffolding, should be in accordance with the "construction of steel tubular scaffold safety technical specifications" (JGJ1302001), for scaffolding, should be in accordance with the cuplok scaffolding component (GB24911-2010) and JGJ 166-2008 construction cuplok Scaffolding Safety Technical specification, the scaffolding should be in accordance with the "construction steel scaffolding safety technology standard" (JGJ 128-2010), other types of scaffolding should also refer to the relevant standard.
Q:Question For Engineers. I'm gonna put up a 12m high ceiling and I want to ask for suggestions for scaffolding?
I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
Q:Calculation method of various kinds of fasteners and fastening screws for engineering scaffold steel pipe
0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.
Q:Bowl buckle scaffold can be used to support it
Need to take some special way to do some processing
Q:How do each of the scaffold scenes in the Scarlet letter have Puritan and Romantic ideaology??
the first is puritanistic because of public humiliation and romanic because pearl notices her father at such a young age. the second because they are together as a fam(puritans did not belive in individualism) and romantic because the stars make an A in the sky. the third because of public confession and dimmesdale dies
Q:The relationship between the height of the scaffold and the design load
Compared with the steel pipe scaffolding, saving more than 500 thousand yuan of funds;
Q:What is the difference between the bowl buckle steel tube scaffold and the steel pipe scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation;
Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from?
Sum of Moments around right wire: T(6.4)=9.8*(440(5)+85(3.2)) T= 3785N
Q:In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
Technical code for safety of steel tubular scaffold with couplers in JGJ130-2011 constructionJGJ128-2010 technical code for safety of steel tubular scaffold for building constructionTechnical code for safety of JGJ202-2010 construction scaffolding
Q:Pankou scaffolding, scaffolding what.
Especially you want to rent it, the more appropriate scaffolding. Because the service life of Pankou scaffold in 20 ~ 30 years and during the basic need of maintenance

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range