best price Cup lock scaffold cuplock system scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:

1500





Size:

Customized

Material:

Q235,Q345

MOQ:

2000 sets

Surface finish:

Powder coated,galv or HDG

Using life:

4-5 years

Technical:

Cutting,Welding,Derustin,Paint

Dimentions:

48.3*3.25mm

Quality:

Good bearing/Durable/Stable



Packaging & Delivery

Packaging Detail:by steel pallet
Delivery Detail:20 days upon prepayment

Heavy Duty Rigid Modular Cup Lock Scaffolding For Bridge

Feature

1. Cuplock scaffolding system has high flexibility and high loading capacity. And it is mainly used to build bridges, tunnels, metro stations, and etc.

2. Cuplock scffolding is made by Q235 steel which is strong and durable.

3. A complete cuplock scaffolding system includes standards, ledgers, or diagonal braces.

4. The accessories of cuplock scaffolding system are cantilever bracket, side bracket, ladder bracket, ladder, intermediate, and etc. 
5. One standard is welded an up cup and a bottom cup in every 500mm to join ledgers at different
heights.
6. One ledger is welded a ledger blade on both ends. 

Specification     

Item Name

Cuplock Scaffolding

Brand Name

Queen

Raw Material

Q235 /Q345steel Grade

Components

Standard.Ledger .Diagonal brace. Top/Bottop Cup/ Ledge Blade

Surface finish

Electric Galvanized/HDG/Powder coated

Size

 

Pipe size:48.3mm

Thickness:3.25mm

Usage

Widely used in Bridge .Tunnel.Peterifaction.Shipbuilding .railway,Airport. Dock Industry and Civil Building

Packing

By Steel pallet or bulk


 

 

 

 

 

 

 

Standard

48.3*3.25*500mm

3.5kg

48.3*3.25*1000mm

5.6kg

48.3*3.25*1300mm

8.0kg

48.3*3.25*1500mm

8.75kg

48.3*3.25*1800mm

10.6kg

48.3*3.25*2000mm

11.4kg

48.3*3.25*2500mm

14.0kg

48.3*3.25*3000mm

16.70kg

8.3*3.25*4000mm

20.36kg

 

 

 

 

 

 

Ledger

        

48.3*3.25*650mm

2.54kg

48.3*3.25*914mm

3.6kg

48.3*3.25*1065mm

4.10kg

48.3*3.25*1150mm

4.7kg

48.3*3.25*1570mm

5.76kg

48.3*3.25*1829mm

6.62kg

48.3*3.25*2130mm

7.62kg

48.3*3.25*2438mm

8.24kg

48.3*3.25*3050mm

10.68kg

 

 

 

 

 

 

Diagonal brace

      

48.3*3.25*915mm

3.4kg

48.3*3.25*1150mm

4.04kg

48.3*3.25*1572mm

5.34kg

48.3*3.25*1829mm

6.13kg

48.3*3.25*2130mm

7.06kg

48.3*3.25*2438mm

8.01kg

48.3*3.25*3050mm

9.90kg

 

Steel Plank

 

210*45*1.2*1000/2000/3000/4000


250*50*1.2*1000/2000/3000/4000


 

 

 

Screw jack base

   

38*4.0*500mm

3.35kg

38*4.0*600mm

3.65kg

48*4.0*600mm

4.4kg

35*500mm

4.5kg

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Advice to anyone thinking about getting an industrial/scaffold piercing?
no its sixteen interior the united kingdom for any variety of ear piercing sixteen with out parent permssion and it will harm rather undesirable take a protracted time to heal and it will value approximately £35-£40 and clean it with salt water.
Q:Exterior wall scaffold construction plan?
Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
(less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
Q:During what month does Hester mount the scaffold in The Scarlet Letter?
Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q:Can you do the outer scaffolding?
(4) the lower part of the inclined bar at 30 cm in height from the ground and control connection pole. (5) according to the height of the structure and the length and the width of the scaffold, it should be combined with the actual situation in the construction to set up the scissors and the diagonal brace. (6) the scissors rod connected by the lap, lap length not less than 100 cm, and not less than 2 rotating fastener, rod end edge to the distance of the fastener cover more than 10 cm. 8, laying the scaffolding board (1) scaffold set level in 3 horizontal bar, and the two ends at 8 cm with a diameter of 1.2 mm galvanized wire hoop around the 2 to 3 ring fixed. When the scaffold length is less than 2 meters, the two small bar support.
Q:Scaffolding installation and precautions?
The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range