Best Choices for Swivel Scaffolding Swivel Couplers

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details:

 

Place of Origin:Hebei China

Model Number: GTJ-002

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements

 

Packaging & Delivery:

 

Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.

Delivery Detail: WITH IN 25 DAYS

 

 

1. Product Information

 

Product Name

Japanese Type Swivel Scaffolding Couplers

Type

GTJ-S002

Material

Q235

Thickness

2.5mm or 3mm

Weight

0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951

Dimensions

48.6   x 48.6mm

MOQ

10000PCS

Product feature

anti-rust,   skid proof, high breaking strength

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Latch type disc scaffolding accessories are national patent products?
The utility model is mainly used for a light frame and a background frame of a large-scale concert Pankou, type multifunctional scaffold, the scaffold socket diameter of 133mm and thickness of 10mm disc, 8 hole disc, adopting 48*3.2mm, Q345A pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disk. The bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
Q:How can I cover my industrial/scaffold piercing when I'm playing sports? sports?
Why no longer enable your ear pieced lower back while you're off out of your prepare like in case you have a much better than one week holiday so which you do no longer could desire to get rid of and placed your jewelry many of the time. a minimum of you could evade preserving your ears many of the time and evade the an infection. you could enable your ears heal ideal. in case you could no longer wait to have your ear pierce lower back once you get rid of and placed decrease back your jewelry make it beneficial you sanitized your palms by skill of washing and employing alcohol. placed Neosporin (antibiotic ointment) on your new pierced jewelry and on the jewelry itself in the previous putting it decrease back. in the previous additionally they use medicated string or thread on the ears for the piercing of latest child toddlers.
Q:scaffold pierving help please=] ???!!?
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:Exterior wall scaffold construction plan?
Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
Put the wheels (locked) on 2 x 12 planks. This will distribute the weight.
Q:Scarlet Letter Scaffold scenes?
No. Santa doesn't like this movie.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:I want to know the classification of scaffolding in the building
Material division according to bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:seriously i need help with my scaffold piercing please !?
Dab it with tissue until it stops, Try not to play with it too much and if you need to touch it, ALWAYS wash your hands before doing so. Also do hot salt water soaks (as hot as you can stand) twice a day and it'll heal nicely in no time :)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range