Asphalt Mixing Plant SAP120 120 TPH

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
30 Sets per Month set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Detailed Product Description of SAP120 Asphalt Mixing Plant ( 120 TPH)


Batch Mixer: 1500 kg/batch

Drying Drum:1800X8000mm

Mixing Tower:6 sections .

An ideal plant for maintenance work or medium road project, because it combines wide range of configurations. An ideal plant for maintenance work

or medium road project, because it combines wide range of configurations.


Specifications of SAP120 Asphalt Mixing Plant ( 120 TPH)

Output 120 TPH

Batch Mixer 1500 kg

Dryer Drum Dia:1800 mm ;

Length: 8000 mm

Mixing Tower Height:15500mm

Hot Asphalt Bins:30T

Mixing Tower include 6 sections

mixing tower with lasted modular design , easy dismantle and assembly .

screen sections , eccentric shaft vibration design, with 21.4 sq. m

hot aggregate bins section ,5 size silos ,emergency overflow included

weighing process(hot aggregate, bitumen ,filler) and mixer sections  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long will it take for a concrete mixer to beat ten square?
1, 2 square, each time you can mix 1 square, top material, stirring, material for about 10 minutes, (depending on the material speed), 10 square about 100 minutes
Q:How much concrete the concrete mixer can stir at a time
350-concrete mixer is a double conical turning out of the feed mixer, and the plastic and semi-dry hard concrete of 60 mm. Stirring when the mixer is turning, and automatically when reversing. Each can be mixed with concrete 0.35 cubic meters. Depending on the size of the concrete, the amount of cement used varies.
Q:How to safely use concrete mixer
Concrete mixer operation method: 1. The concrete mixer should be placed in a firm place, with the support of the bracket or the support of the foot barrel, and cannot be supported by the tyre. Before the concrete mixer starts, check whether the controller is good. When the concrete mixer is hoisted in the hopper, it is strictly forbidden to pass or stop by the hopper and set up the mixer after the work is completed. When the concrete mixer is running, it is strictly forbidden to put the tools in the roller, and pay more attention to safety. When the concrete mixer is on site, it should be fixed in the mixer, cut off the power supply, and when it enters the mixer cylinder, the outside must be monitored. (the operator of the concrete mixer (driver) must be trained in safety technical training, qualified for examination, and will be held on the certificate and strictly prohibit non-driver operation. The concrete mixer must clean the inside, especially in the winter, which can prolong the service life by using no foreign material in the front roller.
Q:The safe distance of the concrete mixer
1. The correct use of 1) to ensure the mixing quality of the mixture, it must be the gravel, sand and cement to be accurate. Before stirring, adjust the position of the pointer on the water tank indicator to control the amount of water. The mixing time should be strictly controlled, and the hopper discharge should be clean, otherwise it will affect the mix of the next mixture. 2) when loading in the feed hopper, should pay attention to the loading sequence, namely the rubble next, cement, sand, in the hopper rises so does not cause cement float in the sky. When the work is finished, pour some gravel or sand into the mixing drum, stirring up 10min. Otherwise, it will be difficult to clear after the rest of the drum solidifies.
Q:What is the difference between a concrete mixer, a JL type and a JW type?
The jw-375 concrete mixer is a turbo-reinforced concrete mixer, which is used for hard and semi-dry concrete. The main body of this mixer consists of the frame, the feeding system, the mixing system, the water supply system, the control device and the transmission mechanism.
Q:How much is the blender machine stirring
The discharge capacity 350 l 500 l Feeding capacity 560 l 800 l productivity 18-21 m3 / h 25 to 30 m3 / h Maximum size of bone grain (pebble/gravel) 60/40 mm 80/60 mm Stirring shaft speed 28 r/min 24 r/min The engine power 19.55 kw 24.75 kw Mixing time 30 s 30 s Overall dimensions 2530 * 2340 * 2340 mm 2600 * 2790 * 2790 mm The weight 3700 kg 4000 kg Related instructions Product specifications: JZC350 Product price: 10000
Q:What is the type of concrete mixer?
There are 250, 350, 500 and so on, and the model is for his capacity. Is that satisfactory?
Q:Concrete mixers need to be aware of which things
Prior to the use of the new machine, the requirements of the manual of the concrete mixer shall be conducted according to the instructions of the concrete mixer, and the test and the necessary trial operation shall be conducted for each system and the parts. Running in the empty car, checking the rotation direction of the mixer or stirring leaves, the operation of each work unit, the brake, the confirmation of normal, the operation. Fixed concrete mixer should be installed on a strong pedestal. When used in the long term, the ground bolts shall be buried; If used in the short term, you can lay the sleeper and stabilize the sleeper. For mobile concrete mixer, it should be installed on flat and hard floor with square or supporting frame, and hold water flat tire. If more than three months should be used, the tire should be removed properly and the shaft end should be cleaned and rusted. For some mixers that need to be excavated, the ground of the pit should be strengthened to prevent the surface water from entering the pit. The bottom end of the material rail frame should be rammed or laid, and the back of the frame shall be supported by wood to prevent the deformation of the track during work. After the concrete mixer has been started, the mixing drum should be made up after normal speed and after loading, it should be added to the water in time. The new material must be removed before it can be removed. Do not start the blender when the load is stopped or full load, except for the reverser.
Q:250 litres of the blender once made concrete
250-liter blender once gives 200 to 220 litres of concrete. 250 litres of time the amount of concrete mixer quantitative is 250 litres, but is usually not meet this standard, because in the process of mixing concrete appear adhesion or water loss, so the volume will narrow. The actual quantity is approximately 80% of the quantity. A concrete mixer is a machine that mixes cement, gravel and water into concrete mixtures. It consists mainly of mixing, loading and unloading mechanism, water supply system, original motive, transmission mechanism, frame and supporting device.
Q:How many cubic meters of concrete is mixed with concrete mixer?
The number of machines varies from one to the other. Look at the machine model.
Our produces are recognized worldwide for high quality, reliability and excellent after-sales services. We also attain CE and ISO9001:2000 Certificates. Currently, we sell our products to over 60 countries. Our vast line of products is available for countless use, meeting all our customers' special needs.

1. Manufacturer Overview

Location Henan,China
Year Established 2011
Annual Output Value US$10 Million - US$50 Million
Main Markets 35.00% Mid East
20.00% Africa
20.00% Eastern Asia
10.00% Domestic Market
10.00% South Asia
5.00% Southeast Asia
Company Certifications ISO9001-2008;

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Qingdao Port,Shanghai Port
Export Percentage 61% - 70%
No.of Employees in Trade Department 21-50 People
Language Spoken: English, Chinese, Russian
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines 4
Contract Manufacturing
Product Price Range Average