Asphalt mixing plant LB1000

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


The following information for your reference,more detailed information about out plant please feel free to contact me.

Item

Description

Remarks

1

Cold Aggregate Batching Machine and Feeders

Group of four components, unit capacity of the aggregate hopper is 8M³ (full hopper), the total capacity is 32M³;

Adopts imported variable-frequency governor;

Continuous dosing belt & driving reduction motor group, group of four units;

Electric vibrator for the sound hopper, two units

4 SETS

2

Aggregate Collecting Conveyor Belt

10×500 MM. , ~ Approx. 16 M

1 SET

3

The Aggregate Charging Conveyor Belt, inclined

10×650 MM.  , ~ Approx. 8 M; CAPACITY: 100T/H

1

4

The Drying Drum

Ø1540×6680 MM, Running speed: 11.3 RPM, Cylinder on frame,

Rotation drive through electric motor and reducing box;

Heat-preservation is 50mm rack wool and stainless steel

1

5

Burner Group for the Dryer, the Chinese automatic control oil burner with one unit 10t diesel oil tank and one unit 10t heavy oil tank

1

6

The Mixing Tower

The mixing tower with supporting legs, repairing platform, ladder and guardrail.

1

7

The Hot Aggregate Elevator

Adopts two-rank anchor chain, capacity 100 T/H

1

8

The new filler bin: 13 M³, the charging of the filler through hopper elevator

1

10

Vibrating Screen Unit: 4 grades; capacity: 100T/H

1

11

Hot Aggregate Material Storage Bin

4 numbers , total volume: 10.5 M³

1

12

Weighing Device

Weighing unit for powder, hot aggregate and bitumen (each has one set)

3

SETS

13

The mixer

Mixing capacity: 1000 KG/Batch, motor power: 44kw

1

14

The Filter (dust catcher)

Adopts vertical cyclone dust catcher and water dust filter

1

15

The Controlling Room is the container type (5.19M*2.25M*2.5M)

1

17

Bitumen Supplying system

The general bitumen tank (25t, 2 units); the bitumen pump: capacity 15.6 M³/H, pipeline, 3 -WAY VALVES; one 10t bitumen discharging pool

2

18

The Thermal Oil Heater: 400,000 Kcal / h, adopts the oil burner

1 SET

19

Voltage: 380/220; frequency: 50HZ



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between a concrete mixer and a mortar mixer
In power, power, and volume, concrete mixers search large
Q:How many cubic meters of concrete is mixed with concrete mixer?
Js5001/750/1000/1000/1500/2000/3000/3000 concrete mixers and concrete mixers Depending on the model, you can determine a 0.75 square plate of 0.5 square 750 for the 500 The smallest drum mixer is 0.3 square
Q:What is the JZ250 concrete mixer
Jzc250 introduction 1) the discharging capacity of 250 l 2) feed capacity of 350l 3) productivity 7-10 m3 / h 4) mixer cylinder speed 17 r/min 5) the maximum size of the aggregates is 60mm 6) the accuracy of water accuracy is less than 2% error 7) stir the motor 4 kw 8) pump motor 0.55 kw 9) maximum drag speed 115km/h 10) dimensions (x width x height) 2226x1990x2750mm 11) the weight 1950 kg1650kg1500kg
Q:A concrete mixer can last for years
Both, so you need an old driver and your partner in situations you don't know very well. 2, in the car use out of the maintenance in time according to the requirements of specification and manufacturer, at ordinary times into the construction site to site operators replacement using method, avoid ruining their error was to take. 3, service phone to keep in mind that other manufacturer, encounter problems consult factory staff more at ordinary times, during the warranty period (6 months) don't oneself to repair vehicles, service personnel to solve the problems to make manufacturer, to avoid unnecessary dispute in the future. Special attention is to keep the inside and outside of the tank, prevent the appearance of the can and keep clean, and can sell the car for a good price in the future.
Q:How does a concrete mixer operate
Steps and considerations for concrete mixers: Steps: 1, switch the function switch from the column to "automatic" position, press the start switch on the controller, and the whole operation will operate automatically. After the whole process is finished, it will stop automatically, and in the running project, if it is necessary to stop, press the stop button and then restart. After the start button is pressed, the display begins to show time, slow, sand, fast, stop, fast, and run the light on time. When automatic control, all the switches must be allocated to the stop position.
Q:The concrete mixer has the fittings
Concrete mixer points generally mixer and forced mixer, currently used in engineering is forced, the difference is that the former is the shell in turn, the latter is in inside agitation. The most commonly used parts of a strong mixer are: hoisting bucket wheel, mixing arm, blade, hopper limiter, liner. Normally the mixing arm, blade, and lining plate for the vulnerable parts, should be replaced in time during construction.
Q:Concrete mixers need to be aware of which things
The concrete mixer should be set in a flat position, and the wheel shaft will be placed on the back and back of the square, so that the tyre should be set up so that it will not move during the run. 2, the concrete mixer should be protected by secondary leakage, and after the power connection is put on before work, it must be carefully checked, and it will be used only if it is considered qualified by the empty car test. Commissioning should check when mixing drum speed whether appropriate, under normal circumstances, the proportion of empty car speed car was faster (after loading) 2 ~ 3, such as the difference is more, should adjust pulley and the proportion of the driving wheel. The rotating direction of the mixing cylinder shall be in accordance with the direction of the direction of the arrow, if it is not true, the motor connection shall be corrected. 4, check whether the transmission clutch and brake is flexible and reliable, wire rope is damaged, track pulley are in good condition, surrounded by accessibility and lubrication situation of each part. After turning on the machine, it is often noted that the parts of the concrete mixer are working properly. When stop, check whether the concrete mixer blade is bent and the screw is loose or not. 6, when the completion of concrete mixing or pause is expected to more than 1 h, besides excess stock out of the net, the application of stones and water to pour into shaking inside the cylinder, turn on, put the glue on the cylinder of the mortar all discharged after rinse. No water is allowed in the cylinder in case the cylinder and blade are rusted. It should also clean up the outside of the mixing cylinder to keep the machine clean. 7, after work and stop after work, should pull off power without power, and lock switch box, to assure safety.
Q:Is the concrete mixer and mortar mixer a machine
A concrete mixer is a machine that mixes cement, gravel and water into concrete mixtures. It consists mainly of mixing, loading and unloading mechanism, water supply system, original motive, transmission mechanism, frame and supporting device. Including through shaft connected to the drive motor structure dynamic mechanism and driven by the driving mechanism of drum, the drum cylinder jacket around the cylinder cylinder gear ring set, set with the ring gear meshing gear on the shaft. The utility model has simple structure, reasonable, the use of mesh gear, gear ring, which can effectively overcome the fog had, between the roller and the mixer drum skid phenomenon; The driving mechanism can further assure the skidding between the roller and the mixer. Works: make each composition on the macro and micro evenly, destruction of cement particle reunion phenomenon, promote the development of dispersion phenomenon, initial water damage of cement particles on the surface of the compound film wrapping layer, prompting particle collision between friction materials, and reduce the influence of dust membrane, improve the mix of each unit body to participate in sports frequency and trajectory of the crossover frequency, acceleration and qualitative.
Q:Operation procedure of concrete mixer
Safety procedure of concrete mixer A blender must be placed in a solid place, secured with a bracket or a leg holder, and no tires should be replaced. Before starting the mixer, the clutch, brake, wire rope and so on should be checked, and no foreign material in the roller. When the hopper is hoisted, no one shall pass or stay in the hopper, and the hopper shall be fixed after the work is completed. When running, it is strictly forbidden to put the tool into the roller. It is strictly forbidden to leave the work station without any evidence of operation or operation. When repairing, should fix the hopper, cut off the power supply. After the work is finished, should clean the fuselage concrete, do the lubrication to maintain, cut off the power to lock the door.
Q:The difference between concrete mixer and concrete mixer
Concrete mixing plant is including weighing, feeding and a series of complete system of equipment, and concrete mixer is a mechanical stirring mixer belongs to a kind of mixing equipment. The mixing machine in the mixing station is a strong mixer in the concrete mixer, so it is fair to say that the mixer is a member of the whole equipment of the mixing station. No matter which of the two devices during start-up operation, safe operation, must pay attention to the hopper should ensure reliable braking at any position, hopper should not fall; The movement of the upper and lower limit devices should be sensitive and reliable. The safety cover of the open gear and belt should be complete and intact, and the safety pins and safety pins of the hopper safety hook and track should be in good condition and complete. The leakage protector parameter should match, the installation should be correct, the action should be sensitive and reliable. Belong to the mixing machine, concrete mixer and concrete mixing station their application field the same, only choose the appropriate mixing plant equipment according to user's demand

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range