API Hot Spring Pipe High Pressure GRE Pipes and Fittings

Ref Price:
Loading Port:
Lianyungang
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

API Hot Spring Pipe 
1.Standard:API,ASTM,ISO,GB, etc 
2.Anti-corrosion & high strength 
3.Long service time 
4.Low costs

GRE (Glass Reinforced Epoxy)

Some times, GRE and FRP/GRP (Fiber/Glass Reinforced Plastic) are regarded as the same

material with different names, but in most cases, since GRE choice epoxy resin as material, 

it has stronger performances.

 

It is the thermosetting plastic products combining the reinforced material of fiberglass roving with the base material of epoxy resin
It is made by mechanical filament wound process controlled by computer. 
So it is a kind of composite material. 

 

The GRE pipe offers a unique combination of chemical resistance, size stability, high strength, and thermal/electric non-conductivity.


So the GRE pipe can be used in the fields of chemical anti-corrosion, construction, electric insulation, power development etc.

  

Features:

1. Anti corrosion

2. High strength, more safety

3. More than 30 years service life

4. Light weight, easy installation and keeping cost

5. Flexible design and shorter reform term

6. No medium pollution

Technical Table

API Hot Spring Pipe High Pressure GRE Pipes and Fittings

API Hot Spring Pipe High Pressure GRE Pipes and Fittings




Applications:

1.Oil, petroleum, natural gas pipeline

2.Irrigation, hot spring, city water pipeline

3.Brine delivery pipeline

4.Other liquid transport pipeline

 

Strength: 

1.High quality

We're state owned manufacturer with registered capital RMB 200 million specialized in this area.Standard:API-15HR,API-15LR,ISO9001,GB,etc.

2.Competitive price

Our raw material is from PPG SINOMA JINJING FIBERGLASS CO.,LTD, a JV enterprise

invested by our company and PPG industries to ensure high quality and low costs.

3.Great production capacity and short delivery time.We have 16 production lines for GRE pipe, with annual production capacity of 16000MT. 

Pitcures of our factory:

API Hot Spring Pipe High Pressure GRE Pipes and Fittings

API Hot Spring Pipe High Pressure GRE Pipes and Fittings

API Hot Spring Pipe High Pressure GRE Pipes and Fittings

FAQ of GRE pipes:

Q1: What’s the performance standards?

Lianzhong pipe is designed to meet all of these ASTM , AWWA, BS, DIN standards.

Q2: What’s the qualification testing for the products?

 Lianzhong pipe has been rigorously tested to verify conformance to the ASTM D3262, ASTM D3517, AWWA C950 and DIN 16868 requirements

Q3: How long can I receive my goods?

A: Usually, we will deliver products within 20 days after the contract is signed. Delivery time is negotiable when necessary.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the differences between inorganic FRP pipes and plexiglass pipes, what are the advantages and disadvantages?
Inorganic glass fiber reinforced plastic wind pipe: magnesium magnesite soil and glass fiber mesh cloth made of advantages: flame retardant shortcomings: large proportion, low strength
Q:What is the thickness of all types of FRP pipes?
DN200, DN150, DN100, DN80 pipe, polyurethane foam pad, 50mm thick shell, glass steel, thickness 3mm.
Q:What's the difference between glass fiber reinforced plastic pipe and glass fiber reinforced sand pipe? What kind of material is good?
Sand tube is more brittle, gfrpmp is relative to the glass tube can be called pure glass tube, glass tube is not with quartz sand, the two pipes generally used in different areas, the pure glass pipe can be used in most areas, but the sand tube is generally only used in the political field, especially is the large diameter sand tube.
Q:There is a gap between the new glass fiber reinforced plastic pipe and its through wall. How can the plug be prevented from leaking through the cracks around the pipe?
Large glass fiber reinforced plastics plants such as the United States and Asia, with FRP through the cabin, can be used to solve your problem, the gap is filled with special blowing agent. In this way, the continuity of FRP material can be guaranteed.
Q:Glass tube has different diameters with different prices. Who can elaborate?
The standard for FRP pipe execution is GB21238-2007
Q:FRP duct material plan is how to mention?
Process design according to user's requirements and choose what material to use. Then according to the drawings and process, calculate the amount of various materials. According to the delivery date and production schedule, you can write the material schedule.
Q:Would like to ask about the plastic lined steel pipe, steel pipe, glass steel skeleton, the advantages and disadvantages of each ceramic pipe, to know a friend told, very grateful!
Plastic lined steel pipe of strong corrosion resistance, heavy quality, need to be made, on-site installation, if the size deviation cannot be installed. The price is more than 5 times more expensive than that of FRP
Q:What kind of material is the pipe of the pipe that installs the pressure transmitter of GRP conduit? Is it fiberglass or carbon steel?
It is generally assumed that it is made of glass fiber reinforced plastic. The main pipe is made of glass fiber reinforced plastic. The medium is corrosive. Other materials must not be suitable
Q:What are the construction methods of glass fiber reinforced plastic paint anticorrosive pipes?
Epoxy coal tar pitch is a kind of anti-corrosion form with high cost performance. The engineering test shows that the epoxy coal asphalt is used as cathodic protection.
Q:FRP acceptance standard
As the glass pipe between the use of socket type, double "O" type sealing ring connection, so each installation of a pipe, it is necessary to bear in the socket to suppress, in order to detect double "O" type sealing ring sealing effect. The pressure test pump passes directly through the test hole on the top of the pipe. The water pressure of the pipeline working pressure of 1.5 times after the pump stops (during the operation to open the drain valve exhaust), observation of 2min, the pressure drop value does not exceed the test pressure and the nozzle 5%, no leakage, nozzle pressure test is qualified. If the pressure drop is faster, the sealing effect is poor and needs to be reinstalled to ensure the overall pressure test of the FRP piping system is successful.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range