Aluminum Insulation Flexible Duct For Heat Ventilation Use

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
20000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications
Insulated aluminum flexible duct

extension rate:1:10

Low /medium pressure central HVAC system flame and heat resistant

Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting

 

Material:

Double layers of aluminum foil reinforced with high tensile spring steel wire

Structure: High elastic wire, aluminum foil. A reinforcement model can be required.

Aluminum foil thickness: 0.035mm

Temperature range: -30°C~+140°C

Maxim Air Flow: 30m/s

Maxim working pressure: 2500 pa

Standard Length: 10m/pc  Or as your requirement

Fire resistance: Non flammable.

Normal packing: In carton. Or as your requirment

Application: Low /medium pressure central HVAC system and ventilation system.

Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc

Description

100% Non-asbestos Fiber Cement Board

Raw Materials

Cement,Quartz Sand,Paper Pulp,etc.

Standard Size

1220mm×2440mm or 1200mm×2400mm

Max Width

1220mm

Max Length

3000mm

Thickness

4-20mm

Density

1.30-1.50g/cm3

Color

Light yellow or Grey

FAQ 

we pay attention to the quality as company life, we are in the line of middle & high quality air filter and duct,

We look into the details and timely delivery guaranteed.

Pleasant service and respond quickly.

Reasonable price 

around 2 hours to Shanghai , 60 km distance to the Ningbo

Aluminum Insulation Flexible Duct For Heat Ventilation Use

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Does the desulfurization and denitrification equipment use metal hoses?
Fire pipe clamp connector leak technical details Detailed: trench-type fire pipe in the use of a long time after the sudden pressure relief occurs after the pipeline displacement caused by leakage of the clamp joints, light with a tight clamp clamp is not necessarily good Effect, because the rubber ring aging, lack of flexibility. The best way to do this is to remove the trench clamp from the inner wall of the trench with a "3mm" thick rubber (available with a thin car inner rubber) with a width of about 2 " ~ 3mm ", cut and then fasten the clamp bolts, water leakage problem is solved.
Q:How is the flexible casing of the fire pond connected to the tube?
Composite tube: in a tube of the tube with more than two electrode system, each electrode system independently through the electronic flow, to achieve their own functions, this tube is called composite pipe
Q:Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
Air conditioner is the air temperature, humidity, purity, air speed, for processing, to meet people's production and living needs of the equipment, referred to as air conditioning
Q:Plastic tube most afraid of what the East unitary
The bonding strength of the gypsum board and the extruded polystyrene plate is ≥010MPa, and the interface is in the extruded polystyrene board The bond strength of the bonded gypsum and the composite plate is ≥010MPa The combustibility of the composite plate reaches B1 level Construction technology points: the installation of the board between the natural close (including the long board) does not leave; for long board, should be installed before the hardening of the bonding material can be carried out; per square meter composite board with at least 2 Expansion of the anchor, each commonly used specifications of the composite board at least 6 expansion anchors evenly anchored to the grass-roots wall; external walls and internal wall connection should be extended to the wall, the width should not be less than 300mm; And wall bonding area ≥ 30% Applicable conditions and scope: hot summer and hot summer and warm winter area outside the building insulation works
Q:Is the flexible sleeve of the broken wall used as a second retest?
The national standard is 18kg. Color steel sandwich panel is a common product in the current building materials, do not chu chu dumpling seal festival over the extinguished Long can only be a good flame retardant and environmentally friendly and efficient. Caigang sandwich board has two layers of metal panels and the middle of the polymer core insulation from the suppression. With the installation is simple, light and efficient light and efficient features. And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor.
Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
See the situation, the general 3 percent or so, to see how the management of LZ, hand thank you
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
Extrusion plate (XPS) is a polystyrene resin or its copolymer as the main component, add a small amount of additives, made by heating and extrusion with a closed-cell structure of the rigid foam
Q:What is the effect of concrete pouring on the construction quality?
, why should set the flexible pipe, because all the materials are hot and cold shrink, you layout the pipeline When the temperature and your future use when there is a difference in the temperature and the thermal stress when processing, if not Ji plant perfection Dao Ghost voucher set the flexible pipeline, the pipeline will have a lot of internal stress, long-term alternating role will Resulting in pipeline damage, set a lot of places, such as straight pipe, to a certain length must be set, the inflection point also need to set, these settings you can be in the mechanical design manual pipe chapter check out
Q:The first generation of the tube is that year out?
In general, there is also a strong ability to resist, it is likely that there may be cracking
Q:I am sorry to see your answer in Baidu, can I also pass a copy of my construction and decoration project example?
First of all you have to check the pipe into the inspection, there are inspection data: product certification, the national inspection report, approach the size and quantity; at this stage to do the main inspection and inspection and shelter project inspection data, the need for quality The person in charge of the signature, the supervision engineer signed, you find some of the wages of the official Gongjia pull the yellow rule of the sea to see the sea, there are templates on the top, you can go to Sina love to download the knowledge.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range