Aluminum Insulation Flexible Duct For Air Condition

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
20000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications
Insulated aluminum flexible duct

extension rate:1:10

Low /medium pressure central HVAC system flame and heat resistant

Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting

 

Material:

Double layers of aluminum foil reinforced with high tensile spring steel wire

Structure: High elastic wire, aluminum foil. A reinforcement model can be required.

Aluminum foil thickness: 0.035mm

Temperature range: -30°C~+140°C

Maxim Air Flow: 30m/s

Maxim working pressure: 2500 pa

Standard Length: 10m/pc  Or as your requirement

Fire resistance: Non flammable.

Normal packing: In carton. Or as your requirment

Application: Low /medium pressure central HVAC system and ventilation system.

Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc

Description

100% Non-asbestos 

Raw Materials

Cement,Quartz Sand,Paper Pulp,etc.

Standard Size

1220mm×2440mm or 1200mm×2400mm

Max Width

1220mm

Max Length

3000mm

Thickness

4-20mm

Density

1.30-1.50g/cm3

Color

Light yellow or Grey

 FAQ:

non-insulated aluminum flexible duct

extension rate:1:10

Low /medium pressure central HVAC system

flame and heat resistant

Aluminum Insulation Flexible Duct For Air Condition

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Composite pipe and flexible tube which aspects of the difference
Lap is in the concrete structure of the component, the length of steel is not enough, according to the requirements of the two steel will be superimposed on each other and the formation of the connection The basic forms of steel connections are: lashing lap, welding, mechanical connection several categories Scaffold (scaffold) refers to the construction site for workers to operate and solve the vertical and horizontal transport and erected various stents General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction of the place Mainly for the construction workers up and down work or external safety net enclosure and high-altitude installation components, said white is the shelf, scaffolding production materials are: bamboo, wood, steel or synthetic materials Some projects are also used as scaffolds when the template, in addition to the advertising industry, municipal, traffic, road and bridge, mining and other departments are widely used
Q:Maintenance Skills of Leakage of Fire Pipe Clamp Joint
On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
Q:What is the difference between a rigid sleeve and a flexible sleeve?
Can be from these aspects, 1) energy saving: wall insulation materials, thermal insulation doors and windows, external shading equipment, renewable energy facilities (such as solar hot water, light guide tube, ground source heat pump), energy saving lamps 2) : Water-saving equipment, rainwater harvesting and utilization facilities 3) Materials: 3R material building energy saving In addition to the material, but also consider the small radical engraved moxibustion Chong Chong Yi wipe design, management, control and other issues.
Q:What is the difference between the D-LD2000 clamp-type flexible fittings and the KRJ-type clamp-type flexible fittings?
Polystyrene board in the basement wall from the role of waterproof protective layer is to prevent the backfill due to external forces on the destruction of the waterproof layer. That the use of multi-layer board bear two Cao Dutch 丨 sell Zhatai Chun Jun can not. Because the deformation capacity of polystyrene board is relatively large. And the deformation capacity of the multilayer board is small.
Q:Plastic tube most afraid of what the East unitary
The bonding strength of the gypsum board and the extruded polystyrene plate is ≥010MPa, and the interface is in the extruded polystyrene board The bond strength of the bonded gypsum and the composite plate is ≥010MPa The combustibility of the composite plate reaches B1 level Construction technology points: the installation of the board between the natural close (including the long board) does not leave; for long board, should be installed before the hardening of the bonding material can be carried out; per square meter composite board with at least 2 Expansion of the anchor, each commonly used specifications of the composite board at least 6 expansion anchors evenly anchored to the grass-roots wall; external walls and internal wall connection should be extended to the wall, the width should not be less than 300mm; And wall bonding area ≥ 30% Applicable conditions and scope: hot summer and hot summer and warm winter area outside the building insulation works
Q:Will the embedded stove why use stainless steel corrugated hose connection?
Do not open the window, enjoy the fresh air 24 hours a day, to ensure adequate ventilation (hourly indoor air replacement 0
Q:Talk about the class flexible management of the class teacher what the requirements
National Standard B Administrative Regulation C Industry Code D Normative document Local regulations which of the following are safety technical standards? (ACDE) A Code for safety of construction work JGJ80-91B Construction Engineering Supervision Standard Safety code for construction machinery use JGJ33-2001D Standard for Safety Inspection of Building Construction JGJ59-2011E Tower crane safety regulations GB5144- from the 90's onwards, the Ministry of Construction have prepared a number of building safety technology standards, including (ACDE) A Building construction safety inspection standard B Measures for the Administration of Construction Permit for Construction Works Technical Specification for Safety of Fastener Steel Scaffolding for Building Construction Gantry and derrick material hoist safety technical specifications "the State Council on the further strengthening of production safety decision" (Guo Fa [2004] No 2) pointed out: to strive to build (ABCDE) of the safe production work pattern A Government united leadership Department of supervision according to law The enterprise is fully responsible for D Mass participation in supervision The whole society is widely supported according to the Ministry of Construction on the construction enterprises and the safety of production and management of the main responsibilities of the production of the following responsibilities (ABCD) A Implement national laws and regulations on safe production and standard B Prepare and timely update the safety management system Organize the full safety education Organize security checks Organize the preparation of special construction program
Q:How is the flexible casing of the fire pond connected to the tube?
Composite tube: in a tube of the tube with more than two electrode system, each electrode system independently through the electronic flow, to achieve their own functions, this tube is called composite pipe
Q:Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
Q:What is a flexible interface and what is a rigid interface?
According to the provisions of Article 103 of the "Tower Crane Safety Regulations", the tail of the tower crane is not less than 0

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range