Aluminum-Frame Formwork with Best Price and High Efficiency

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
500 m²
Supply Capability:
30000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Aluminum-Frame Formwork

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand

2.Main Features of Aluminum-Frame Formwork

 

Light weight.

High strength.

High standardized system.

Easy connection with adjustable steel clamp.

Convenient and fast corner formwork.

Flexible to assemble and application.

 

 

3.Aluminum-Frame Formwork Images

 

 

 

 

 

4. Aluminum-Frame Formwork Specification

 

The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

The adjustable steel clamp is convenient to use, and can hold tightly.

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

 

5.FAQ of Aluminum-Frame Formwork

 

What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

What promises can be done by us?

If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to crash the mainland to crash the mainland novice Raiders
Bounced a long time the monster chaos big collection game "crash the continent" (Crashlands) finally landing iOS platform friends
Q:How does the polish table work? How often does the cartridge change?
The negative pressure generated by the smoke through the fan through the side of the exhaust and the lower outlet into the purifier, air into the diversion channel, large particles of dust and the baffle after the collision, the role of large particles of dust fall into the ash collector drawer, Dust containing fine particles into the filter chamber, dust from the outer surface of the filter bag through the filter, the dust is blocked by the filter on the surface, when the dust is blocked in the filter surface deposition, through the manual cleaning machine structure cleaning filter , But also by the pulse of the filter on the filter so that the dust on the filter particles in the filter under the action of vibration from the filter surface into the ash collection drawer, making the entire filter surface are cleaned, the air after purification by the duct , Discharged by the fan
Q:My world mobile version of the survival mode how to synthesize the furnace
My world mobile version of the survival mode synthesis furnace needs 8 round stones
Q:What is the use of stone cutting machines in my world creation model?
Stone cutting machine is a synthesis of stone blocks for the synthesis of Taiwan, the use of it can be synthesized staircase, steps, bricks, etc
Q:Seek a complete pool construction plan. The situation is this, it is the first to remove the original pool and then rebuilt on the site, is in the mountains repair,
The problem is too high, but the Google First, the project overview Sewage treatment South Station 1000 cubic meters of clean water pool is xxxxxxx company xx area supporting facilities engineering, we contracted the cave of civil works
Q:What is the difference between cement mortar mixer and cement paste mixer?
The whole process 240 seconds ± 1 second manual: the knob switch to the manual position, the machine that is rotating, according to the test needs, can control any low-speed and high-speed rotation time, slow control of sand time to control the early, late, long and short Second, the cement paste mixer will be in accordance with the provisions of the cement and water mixing after mixing into a uniform test with the slurry, for the determination of cement standard consistency, setting time and the production of stability test block used Cement paste mixer electrical operation also has two kinds of automatic and manual, but the automatic mixing time and glue mixing different, the slurry mixer automatic program: the knob switch to the automatic position, press the program controller to start the button, that is automatically completed Low speed slow stirring 120 seconds, stop 10 seconds after the alarm 5 seconds a total of 15 seconds, fast stirring 120 seconds of action, and then automatically stop This is the most important difference between the two
Q:How to save money and grade? Mastering skills is that simple
But before we have to pay a lot of money at the expense of decoration, so many people on the cost of decoration control is inexperienced, leading to financial constraints after renovation
Q:Children princess room decoration to pay attention to what? Children princess home decoration Raiders
Saying that the girl to be rich, which has four is a lot of family education concept
Q:Test block check the order of time for the first to send cushion after the test block to send those test blocks
According to the batch of concrete pouring, 100M3 non-mass concrete standard batch of a test block and other provisions of the inspection, the order of inspection according to the order of construction ah; such as pile core concrete test block, brick mold mortar test block, floor Test block (such as the wall on the anti-500 high and the floor of the different height of the inspection should also be a separate) ...
Q:How to play the collapse of the mainland _ collapse of the mainland novice Raiders
Bounced a long time the monster chaos big collection game "crash the continent" (Crashlands) finally landing iOS platform friends

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range