• Aluminum Formworks System for Construction Concrete Buildings With Good Load Capacit System 1
  • Aluminum Formworks System for Construction Concrete Buildings With Good Load Capacit System 2
Aluminum Formworks System for Construction Concrete Buildings With Good Load Capacit

Aluminum Formworks System for Construction Concrete Buildings With Good Load Capacit

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
8000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of  Whole Aluminum Formwork

-Light and easy assemble

-Simple structure.

-Competitive prices

 

3. Whole Aluminum Formwork Images

 

Aluminum Formworks System for Construction Concrete Buildings With Good Load Capacit

Aluminum Formworks System for Construction Concrete Buildings With Good Load Capacit


4. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2m

Aluminum Formworks System for Construction Concrete Buildings With Good Load CapacitAluminum Formworks System for Construction Concrete Buildings With Good Load CapacitAluminum Formworks System for Construction Concrete Buildings With Good Load Capacit 

 

 

5. FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.


Q:What is the change in the aluminum template?
The turnover of the aluminum template is determined by the use of performance. The use of aluminum template system to improve the overall construction efficiency of the construction industry, including in the building materials, artificial arrangements are greatly saved a lot of aluminum template, also known as aluminum alloy template, is made of aluminum alloy building templates, to solve the traditional The existence of defects in the template, greatly improving the construction efficiency.
Q:Now the domestic use of aluminum template project more?
Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
Q:In the Sheng-aluminum template installation workers, how to develop prospects
Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
Q:What is the development prospect of aluminum template design?
More than the number of turnaround, good economy: aluminum alloy template system can be used up to 300 times, each set of template system in a slight improvement can be re-used in the follow-up of new buildings, resulting in long-term low template sharing costs. Aluminum alloy template waste can be fully recycled.
Q:Whether a shear wall aluminum template and wood template can be mixed
Summary: It is recommended to use a combination of two templates in a shear wall. When the number of templates is insufficient, you can use a template alone, but it will be better than the mix.
Q:Aluminum template of the aluminum template advantage characteristics
Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords