• Aluminum Formwork for Concrete Pouring with Fast Forming System 1
  • Aluminum Formwork for Concrete Pouring with Fast Forming System 2
  • Aluminum Formwork for Concrete Pouring with Fast Forming System 3
  • Aluminum Formwork for Concrete Pouring with Fast Forming System 4
  • Aluminum Formwork for Concrete Pouring with Fast Forming System 5
  • Aluminum Formwork for Concrete Pouring with Fast Forming System 6
Aluminum Formwork for Concrete Pouring with Fast Forming

Aluminum Formwork for Concrete Pouring with Fast Forming

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m²
Supply Capability:
60000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Aluminum Form Work Brief Introduction : 

Aluminum Formwork is widely used in highway,railway,bridge,tunnel and shearing wall,etc. It is with light weight and smooth for surface concrete and popular in constructions .

 

2.Characteristic for Wholly Steel Formwork :

   1) High Smooth Surface

   2) Convex ling for Edge Rib

   3) Specialized Connection Pin for Edge Rib Connection

   4) High Stiffness for Aluminum Surface

   5) Light Weight for saving producing cost

   6) Fast Separate and Easy transport

   7) Recycling using

 

3. Aluminum Formwork Specifications:

    1) Maximum Column Size:900 x 900mm   (2’-11.5”x 2’-11.5”)

    2) Design Concrete Pressure: 1,800 psf (90 kN/m2)

    3) Standard Panel Width 900mm, 750mm & 600mm  (2’-11.5”,2’-5.5” & 1’-11.5”)

    4)Standard Panel Height: 3.0m, 2.4m, 1.2m

 

4. Factor & Product Photos :

 

Aluminum Formwork for Concrete Pouring with Fast Forming

 

Aluminum Formwork for Concrete Pouring with Fast Forming

 

Aluminum Formwork for Concrete Pouring with Fast Forming

 

Aluminum Formwork for Concrete Pouring with Fast Forming

 

Aluminum Formwork for Concrete Pouring with Fast Forming

 

5. FAQ

1) What is the payment terms in our Company ?

Generally TT, LC At Sight, West Union , Moneygram . Besides , we can accept LC After Sight , DP etc.

2) Packing For Aluminum Formwork.

Nude or Pallet for Big Formwork and the Accessaries in PP bags.

3) Quality Guarantee

We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .

4) After Sales Service

We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .

5) Time of Delivery

We can overdo work for the customer to make sure the fast shipment


 

 

Q:What is the change in the aluminum template?
The turnover of the aluminum template is determined by the use of performance. The use of aluminum template system to improve the overall construction efficiency of the construction industry, including in the building materials, artificial arrangements are greatly saved a lot of aluminum template, also known as aluminum alloy template, is made of aluminum alloy building templates, to solve the traditional The existence of defects in the template, greatly improving the construction efficiency.
Q:Now the domestic use of aluminum template project more?
Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
Q:In the Sheng-aluminum template installation workers, how to develop prospects
First, it is obeying the instructions. Then, hard work hard not to suffer. Finally, either honestly go to a climb, or put you out. Solution is completed, I was Sheng through drops!
Q:What is the development prospect of aluminum template design?
High quality and stable performance: aluminum alloy template level and vertical degree can be a good guarantee, and the template itself does not absorb water, concrete molding quality is high, so no need for expensive and long plaster work, tiles can also be directly pasted in Inside and outside the wall. In addition, the aluminum alloy template system is based on architectural drawings and then accurate use of computer software and machinery made, so the construction of high precision, especially doors and windows, hydropower equipment with the location and size are accurate and effective Reduce the amount of construction materials used in the latter part of the construction, cost savings.
Q:Whether a shear wall aluminum template and wood template can be mixed
Wood molds are low in strength, poor in stability, low profile, low precision, high water loss, high maintenance requirements when the mold surface is released, the time is fixed, the mold time is late and the load capacity is small.
Q:Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords