Aluminum Foil Tapes with Water based acrylic T-F5004WP

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ProductDescription

A aluminum foil with water based acrylicadhesive. It has good adhesion. Ideal for wind-pipe’s heat preservation of refrigerator and air-condition.

Product Construction

Carrier :Aluminumfoil,alloy: 8011 O

Adhesive glue: A high performance waterbased acrylic

Silicon paper: A white kraft paper, on aside laminated with film PE and coating solvent silicon.  75gram/sm.

TypicalPhysical Properties

PROPERTIES

UNITS

VALUE

TEST METHOD

Backing  Thickness

mm

0.050

PSTC-133 / ASTM D3652

Total  Thickness

mm

0.090

PSTC-133 / ASTM D3652

Adhesion to  Steel

N/25mm

≥12

PSTC-101/ ASTM D3330

Tack Rolling  Ball

cm

20

PSTC-6 / ASTM D3121

Holding power

min

≥1440

PSTC-107/ASTM D3654

Tensile  Strength

N/25mm

75

PSTC-131 / ASTM D3759

Elongation

%

3.0

PSTC-131 / ASTM D3759

Service  Temperature

-10~+110

————

Applying Temperature

+5~+60

————

Product Form & SizeAvailable

Cut Roll: 48 / 50mm (2") / 60 / 63mm (2.5") / 72 / 75mm (3") / 96mm / 100mm(4").

Log Roll:  1020mmx 45 / 50m                Jumbo Roll: 1020mm x 1200m / 1350m

Custom widths and lengths available, contact us forspecifications and requirements

Tolerance:Weight and Thickness: ±10%; Width: ±2mm; Length: Cut Roll: ±0.3m, Jumbo Roll ±0.5%.

The physical and performance propertiesshown are averages obtained from tests recommended by PSTC. A particular rollmay vary slightly from these averages and it is recommended that the buyerdetermine the suitability for his own purposes.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Q:External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @ .com
Q:What is the whole heat exchange fresh air ventilator?
Second, the new insulation decorative board is integrated through the production line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing construction energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing Building energy-saving transformation of the preferred materials
Q:Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q:Space blowing wind is not cold how is it?
The general level of more than 12 layers when you need to use.
Q:Air conditioning ventilation when the sound is a big reason
No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it
Q:The United States direct mail dyson hp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q:Single cold air conditioning function can not change the cold and warm?
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Can be small, according to your roof to do what material.
Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
Common scaffold brace is the U-type care, "construction of fasteners steel scaffolding safety technical regulations" (JGJ Gong Gong Duo Ji-tao pan Revenge two 130-2011) provides "adjustable support bearing capacity design value is not Should be less than 40kN, the support plate thickness should not be less than 5mm ", the general calculation using 30kN.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range