Aluminum and PVC Combine Flexible Ducts From CNBM Group

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
25 litre
Supply Capability:
500000 litre/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.  Aluminum Foil Ducts Description

• Heat-sealing aluminum foil facing is used for duct wrap without applying extra adhesive and suitable for online lamination of glass wool and rock wool.

2.Main Features of the Aluminum foil Ducts

• Light weight

• High manufacturing accuracy

• High strength

• Small inertia resistance

• Strong heat dissipation ability

• Good visual effect

 

3.Aluminum Foil Ducts Images

 

 

fiberglass heat resistant flexible duct

Aluminum and PVC Combine Flexible Ducts From CNBM Group

Aluminum and PVC Combine Flexible Ducts From CNBM Group

 

4.Aluminum Foil Ducts Specification 

TYPICAL PHYSICAL PROPERTIES:

PROPERTIES

UNIT

VALUE

TEST METHOD

Basic weight

gsm

80

ASTM D646

Tensile strength: M. D.

               X. D.

N/25mm

95

50

ASTM C1136

Burst strength

N

25

ASTM D774

Reflectivity of foil surface

%

95

----------

Temp. Resistance

-29°C

+66°C

No change

 keep soft

ASTM C1263

Water vapor permeance

ng/N.s

1.15

ASTM E-96

Water Soak Test

24hrs

No delamination

----------

Width: 1.0m, 1.2m, 1.25 m, 1.30, 1.37m

Length: 200m, 500m, 1000m, 2500m, 2750m, 3300m

Core I.D.: 3"(76mm ±1), 72mm ±1

Based on order, special sizes are also available.

 

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

(1) How about your company?

 A world class manufacturer & supplier of aluminum foil facing and is one of the large-scale professional investment aluminum foil facing bases in China. Annually more than 1000 containers of aluminum foil facing are exported to markets in Europe, America and Japan.

(2)What is the storage condition?

The products should be stored at room temperature and kept from wet and heat source.

It is essential, as with all pressure-sensitive tapes, that the surface to which the tape is applied must be clean, dry, and free of grease and oil.

The user should take test and do trial-application on the above products before coming into application so as to witness and ensure suitability for user’s special purpose and technique. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Flexible pipe trench backfill inspection batch quality acceptance record how to fill
Go to the site to run you may have a harvest; The The The The
Q:How to strengthen the construction management and construction quality control
Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
Q:Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
Flexible waterproof casing is generally suitable for pipes through the walls by vibration or tight waterproof requirements of the structure; rigid waterproof casing is generally applicable to the pipeline through the walls of the requirements of the general waterproof structures; flexible and rigid waterproof casing Wall of the wall, in case of non-concrete should be used instead of concrete walls, and must be a solidification of the casing in the wall; waterproof casing in the construction, chemical, steel, water, sewage treatment and other units
Q:Will the embedded stove why use stainless steel corrugated hose connection?
62-2 meets the requirements 3 The deformation rate of the flexible pipe shall not exceed the design requirements or the provisions of regulation 45 the longitudinal wall shall not appear in the pipe wall, and the annular and other deformation shall be in accordance with regulation 462-3 The requirements of the 4 backfill compaction should meet the design requirements, design requirements, should meet the requirements of Table 463- Table 463-2 Flexible pipe groove backfill site and compaction see Figure 463 Article 462-4 meet the requirements of the general items 1 backfill should reach the design elevation, the surface should be flattened Section 462-5 meet the requirements 2 backfill pipe and ancillary structures without damage, settlement, displacement Section 462-6 Conformity to allowable deviation Average pass rate (%)
Q:The first generation of the tube is that year out?
In general, there is also a strong ability to resist, it is likely that there may be cracking
Q:Plastic tube most afraid of what the East unitary
The bonding strength of the gypsum board and the extruded polystyrene plate is ≥010MPa, and the interface is in the extruded polystyrene board The bond strength of the bonded gypsum and the composite plate is ≥010MPa The combustibility of the composite plate reaches B1 level Construction technology points: the installation of the board between the natural close (including the long board) does not leave; for long board, should be installed before the hardening of the bonding material can be carried out; per square meter composite board with at least 2 Expansion of the anchor, each commonly used specifications of the composite board at least 6 expansion anchors evenly anchored to the grass-roots wall; external walls and internal wall connection should be extended to the wall, the width should not be less than 300mm; And wall bonding area ≥ 30% Applicable conditions and scope: hot summer and hot summer and warm winter area outside the building insulation works
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
Extrusion plate (XPS) is a polystyrene resin or its copolymer as the main component, add a small amount of additives, made by heating and extrusion with a closed-cell structure of the rigid foam
Q:I am sorry to see your answer in Baidu, can I also pass a copy of my construction and decoration project example?
so much? The Lifting workers, shelves workers, electricians, welders
Q:Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
1.5M is the thickness of the board? If it is, in view of the large amount of concrete from the major, then the long spot of the short spot of the prisoners need to pay special training program reported to the chief engineer or expert approval, which is also the most important [template bearing capacity design calculation], proof of design Of the construction program to meet the bearing capacity of concrete to ensure that the template and its bracket should have sufficient carrying capacity, stiffness and stability, can reliably withstand the weight of pouring concrete, side pressure construction load. In recent years, because the construction of non-standard template led to the collapse of a lot of scaffolding, hope to be cited
Q:What are the scope of construction work special operators?
For air conditioning manufacturers, in order to standardize the product design, the two products may be the host of the heat exchanger, compressor, fan motor selection for the same, but they will specifically for different types of product design, manufacturing different main Control parts, and the two models of the host model is completely different.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range