Aluminium windows and doors

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • PVC sliding doors /Glass sliding windows

pvc casement sliding doors specification:

Certificate

ISO9001 : 2000

Door style

European style; American style,Africian style; Asian style

Opening style

casement/swing

Specification

(size, color,etc.)

Different countries have different demands for it.

profile

2.5mm thickness, Conch brand pvc, 1.2mm inforcement steel

Glass

Single, double, tripled glass; double glass with grille.

Low-E glass, Tempered glass, floated glass, reflective glass, etc.

Thickness: 4mm, 5mm,6mm,8mm; Space: 6mm,9mm,12mm,16mm, etc.

Blinds availableauminum or pvc blinds inside or outside

Seal

Rubber sealing strip, black or grey color

Hardware

High quality Chinese hardware,Chugn, Kin Long (Multi-point lock and handle) ,

G-U or ROTO also can be used

Mosquito meshes

Metal and nylon material

      China supplier of pvc doors windows

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The construction method of wall tiles
Q:What are the steps behind the construction of the building after the closure?
The frame is made up of the staircase or the staircase. Mixed structure: do ash cake, elastic line, ready to accept and install the door frame.
Q:The settlement area of the doors and windows is calculated by what size
If the size of the settlement unit by the construction unit you are smiling, it is possible to open a small hole, there may be wrong calculation of the construction unit, there may be your construction drawings taken wrong, the construction unit should take 1800 * 1200 hole
Q:Glass curtain wall and doors and windows to do what information? Do you want to do some information when you install the doors and windows frame? The
1, hidden engineering acceptance 2, the approval and so on
Q:Construction technology to pay how to write ah? Best to give a text, thank you
The format shall be in accordance with the provisions of the local administrative department of construction
Q:Why do wooden doors and windows installed is the first installation of windows and doors after plastering and metal doors and windows and plastic doors and windows is the first plaster into the mouth after the installation
Some wooden windows when the installation is necessary to rely on the inner wall of the flat, that is to say when the wall plastering and other processes are done, the wooden window to the inside of the wall flush with the wall is even more so. If there is attention, then you will find, in fact, the installation of metal frame is also true. And the installation of the windows do not have to limit these, because the general windows are push and pull. And some relatively high-end windows, such as the inside of the window is not the best time to install the same time with the wooden door installation. Mainly depends on the material used.
Q:How to do the water around the window wall
I see your picture, I see the external walls of water leakage, the windows are generally in the window below the water, your upper and sides, as well as the left side of the window so far, there are leaking, should be the wall leakage, I suggest you Buy waterproof treasure (liquid) on the outside brush 2 - 3 times, the window on the four sides made waterproof plastic, can only be the case
Q:Rough leveling how to use?
1. The wall should be measured before construction to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the rough leveling construction thickness from 5mm to 50mm are suitable. 2. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of the construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. 3. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be pre-filled. 4. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". 5. Adjust the "slurry" should be within 30 minutes on the wall, in the grass-roots first scratch scratch again, the purpose is to make the material and the grass-roots contact between the full. 6. And then on the wall approved enough to adjust the "slurry" with 2m long by a one-time scratch can be. 7. Indoor pillars, the location of the corner of the wall should increase the angle, the height of not less than 2m.
Q:Whether it is possible to take a new root
You can re-planting bars! The length of the reinforcement must meet the specification!
Q:Plastic window GB8814-88 what it means
GB8814-2004 (PVC doors and windows).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range