Aluminium Flexible Duct from CNBM China Government Company

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
500 PCS
Supply Capability:
50000 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Features and Characters of aluminium flexible ducting:

1)Non-insulated and insulated Flexible Duct offered  2) Up to 150 and 250 Max. temperature   3) Fire retardant   4) OEM&ODM service offered

Introduction of aluminium flexible ducting:

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building.

1)     Non-insulated Flexible Duct Structure: Two-layer aluminum foils +1 layer of PET film.

2)     Insulated Flexible Duct: Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool, Outer jacket: 1 layer of Aluminium foil   Glass Wool Density: 16kg/m3; Thickness: 25mm

3)     Combined flexible Duct

Pictures of aluminium flexible ducting:

Aluminium Flexible Duct from CNBM China Government Company

Aluminium Flexible Duct from CNBM China Government Company

FAQ of  aluminium flexible ducting:

1.      What temperature maximum? Our products: 150 and 250

2.      What MOQ? Our MOQ: 500 pcs

3.      What payment terms? We accept T/T and L/C

4.      What lead time: 10 days





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the whole heat exchange fresh air ventilator?
Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Extruded board of course, can generally use this to do, indoor and outdoor to do almost, most of the outside is done because of saving space inside the room. Recommended: do indoors, because I was doing the external walls, the insulation often do, the wall is not very good for the first time, because you do before the insulation wall itself is the weight of the valve valve closure of the bone shop stall wipes , Benzene board sticky benzene board is not very strong, live well for a few years, bad two or three years there will be signs of shedding, looking twice thinking.
Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
Common scaffold brace is the U-type care, "construction of fasteners steel scaffolding safety technical regulations" (JGJ Gong Gong Duo Ji-tao pan Revenge two 130-2011) provides "adjustable support bearing capacity design value is not Should be less than 40kN, the support plate thickness should not be less than 5mm ", the general calculation using 30kN.
Q:Space blowing wind is not cold how is it?
The general level of more than 12 layers when you need to use.
Q:Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Decoration refers to the home improvement part, housing construction is the content of the building
Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
Q:Single cold air conditioning function can not change the cold and warm?
External wall insulation should pay attention to what the details?

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range