Aluminium Alloy Wheel for Best Performance No. 405

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
300 set
Supply Capability:
5000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Aluminium Alloy Wheel for Best Performance No.405


1. Structure of Aluminum Alloy Wheel Description:


Aluminum alloy wheel is designed for automobile, a barrel shaped metal parts used to support the tyres within the tire profile. The original factory wheel hub on the market can be divided into steel wheel hub and alloy wheel according to the material. Compared with the former, the latter have more advantages. Aluminum alloy wheel is an excellent representative of alloy wheel. Please check our details of wheels products as following and that is welcome if you have any questions or requirements or the enquiry.


2. Aluminum Alloy Wheel Production Procedure:


• Casting Machine Melting & Full Heat Treatment

• CNC machine CNC made in Taiwan

• Painting Line Full automatic Painting

3. Aluminum Alloy Wheel No.405 Images:


Aluminium Alloy Wheel for Best Performance No. 405

Aluminium Alloy Wheel for Best Performance No. 405

Aluminium Alloy Wheel for Best Performance No. 405


4. Aluminum Alloy Wheel No.405 Specifications & Advantage:



• Lighter than tube wheels makes the total weight of the car getting less weight

• Better cooling performance in longdistance and high speed driving

• Bigger external diameter takes the best performance driving experience for the drivers.

• High speed lowering tyre termperature can reduce wear resistance prevent tyre-shoulder seperation


5. FAQ

For helping you much better understanding our wheel products, we here have organized several common questions for our client which may help you sincerely and please do not hesitate to contact us if you have any questions.


①How do you control your aluminium alloy wheel quality?


We have established the international advanced quality management system,every link from raw material to final product we have strict quality test as following:

Quality Control Certifications : JWL.VIA Japanese Standard

 Impact fatigue testing

 Bending fatigue testing

 Radial run out testing

 Dynamic balance testing

 Air-tightness testing

② How long can we receive the product after purchase?


In the purchase of product within 3 working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers’ requirement as commonly 7 to 10 working days can be served. We could check timely according to your specification requirement and we will try our best to catch the timely & fastest delivery for you.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range