Al-Ground Mounting System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

AL-Ground System is made of 100% aluminum for mounting on concrete strip foundations or ground screw. It is light and strong, graceful and smart.
In our AL-Ground System, the Beam is pre-assembled, the size of the leg and the B-Rail is plan and machined on factory to eliminate the weld and cut on installation site to save your install time and cost.

Our mission is to simplify your installation and ensure the structure safety.


Features:

Installation Site:   Open field
Wind Load:   Up to 60m/s
Snow Load:   1.4KN/m
Applicable Module:   Framed or Frameless
Module Orientation:   Portrait
Main Material:   100% Anodized Aluminum
Fastener Material:   Stainless Steel


Benefits:

Easy Installation
Parts have been high pre-assembly on
factory to save your installation time

Safety and Reliability:
Check and test the structure strictly to
against the extreme weather condition

Flexibility and Adjustable:
Smart design reduce the difficulty of the
installation on the most condition

10-Year Warranty
Grace Solar provides a 10-years
warranty for the material and structure


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
If the installation is very remote no man's land, it is recommended to purchase enough to buy the brand and good quality equipment, maintenance and repair costs are high.
Q:What is the solar stent system?
Concept: In order to maximize the power output of the entire photovoltaic power generation system, combined with the geographical, climatic and solar resource conditions of the construction site, the support structure of the solar modules in a certain orientation, arrangement and spacing is usually a steel structure and an aluminum alloy
Q:How to build an effective teaching stent
analysis of teaching problems and needs, design solutions to teaching problems and strategies to implement the design, evaluation, and constantly improve the design of a systematic process.
Q:How to remove the climbing bag bracket
Climbing bag of the bracket, is a part of the carrying system, took the words, carrying a backpack will be very tired, that the role of mountaineering bag is meaningless.
Q:What is the metal material for the RESOLUTE bracket?
drugs need to be lipophilic in order to pass through the fat Cell membrane, to inhibit the role of smooth muscle hyperplasia.
Q:How does the hydraulic support work
Stent used by the valve group, column, jack, are not allowed in the underground demolition inspection, the overall replacement. Replace the cylinder as far as possible before the shortest, the joints should be installed on the dust cap
Q:What is the difference between a shock support and a conventional stent?
the traditional load-bearing support system is gravity as the main load support system (the traditional gravity support hanger only to withstand vertical load)
Q:Specification for installation of fire pipe support
The spacing of the bracket: the maximum spacing of the bracket is standard, you can Baidu, but the actual installation of the bracket spacing is smaller than the specification, the flange connection, the screw connection when the stent spacing than when the groove connection.
Q:What is the full support system
A construction method, to take a certain interval, dense erection, from the role of the scaffolding construction method. Currently common in the construction of cast-in-place bridges and cast-in-place floor construction.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Installation preparation → prefabricated → trunk installation → riser installation → pipe installation → pipe pressure test → pipe flush → pipe corrosion and insulation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range