Adjustable Scaffolding Q235 Steel Steel Prop

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product information

Model Number: GTJ-P003

Name: Q235 High Quality Steel Slab Props

Material: Q235

Thickness: 1.6mm to3mm or as your requirements

Surface Treatment: as per requirements

Standard: use your standard or international standard

Dimension: Light duty 40-48mm, MID Duty 48-56/58mm, Heavy duty 48-60mm

 

Characteristics:

1. Reliable performance
2. Corrosion resistance
3. Durable finish standards


Adjustable Scaffolding Q235 Steel Steel Prop

.jpg

Functions 

 It is used for construction supporting, timber, formwork, concrete slab and so on. It is very easy and reliable to use

 

Why Choose Us                                                                                            

1. We are experienced manufacturer in Hebei with more than 4 years experience and cooperating with more many countries.

2. We supply qualified products which are certified by SGS and ISO9001:2008. Strict QC to make sure your profit.

3. Timely delivery can be guaranteed because we have a factory which covers an area of 30000sqm and its daily output is more than 50 tons.

4.  A competitive price can be offered because we are a professional manufacturer of scaffolding with an advantage on cost-controlling & production management.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Foundation pit steel support
Steel supported. This is ultimately determined by design.If you are designing the words, it is determined by your design.
Q:Steel support pre pressure construction should meet the requirements
The shape of the support can be cross shaped or herringbone, the horizontal angle of support should not be greater than 55 degrees
Q:How to calculate the axial force of steel support in deep foundation pit
Preload is generally not more than 450kN, because of the use of pile anchor structure is mostly sand, silt, or clay, anti pulling force of this stratum and anchor is limited, 450kN means that the prestressing design tension reaches 450/0.95~450/0.7, which is basically the ultimate anchor in this ordinary formation, if not met to consider the encryption of anchor spacing.
Q:The exterior package aluminum plate, with steel support, about how much money.
General should be between 450-600 yuan / square meters. Only the price in this range, with a real to
Q:What are the testing items of steel support
Strength and stiffness: steel braces must have sufficient strength and stiffness.
Q:The difference between steel sheet pile and foundation pit
The steel plate pile is vertically inserted into the soil.
Q:What is the installation spacing of the steel support of the tunnel 50mm
The number of not less than the number of calculation of steel arch. For example, steel arch spacing design for 50cm, the first product installation distance is 55cm, when the second products will be changed to 45cm, so the cumulative calculation.
Q:What is the pre - steel brace
When it comes to brace generally refers to Rachel steel purlin, it is reinforced, but also to enhance the stability of the purlin purlin, not easy to lose in the external force under certain failure. Section purlin are generally H steel, C shape, Z shape, is reducing cabin panel span and fixed roof panel.The main specifications of steel support are Phi 400, Phi 580, phi, phi, phi, phi, phi, phi, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on.
Q:Steel arch, steel grille, steel support is what?
Supporting the general situation is the tilt of the connection components, the most common is the shape and cross shape of the cross section of the steel pipe
Q:For the deep foundation pit supporting steel purlin supporting scheme of a
Construction sequenceThe pile axis positioning, U type steel sheet pile, steel sheet pile on both sides of steel purlin installed to dig to the bottom, soil structure construction, soil filling, U type steel sheet pile, the extraction of 5 operating baseline determination: Construction of foundation pit construction need to leave Longmen frame fixed axis working face to determine the position of steel sheet pile construction fixed pile position according to the order of the steel sheet pile concrete pile with marked gray line marked the plate pile driving by self vibration type steel sheet pile special mechanical plug

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range