Accessories scaffolding Diagonal Brace

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)
scaffolding Diagonal Brace:
scaffolding Diagonal Brace
silver colors,golden color,
surface treatment:
galvanized or powder coated
different length
working height::
no limitation
Payment terms::
T/T,Western Union
customized package
Brand Name:
Model Number:
1 - 9 mm
Outer Diameter:
32 - 114 mm
Section Shape:

Packaging & Delivery

Packaging Detail:wood cage or as your as your request Diagonal Brace
Delivery Detail:one month after the deposit Diagonal Brace


K-stage System Diagonal Brace
Perfect after-service
Reasonable price

Product Description

                                           K-stage System   Diagonal Brace  


Folding scaffolding, easy to take and Store.

All aluminum structure, with characteristics of more steady and lighter weight for easy handing.

Fitted with castors, easy to move.

Take European advanced design concept, to give priority to product safety performance.

Transom is either made of back-to-back angle bar or T-shape profile with the same fixing device on each ends as the ledger.
They are used to carry 3 to 6 numbers of closed steel batton and toeboard.

Item No.DescriptionWeightPhoto
KTS2448' transom series 2438.4mm23.70kg

KTS1836' transom series 1828.8mm16.70kg
KTS1274' 2" transom series 1270mm9.50kgs
KTS1033' 4-1/2" transom series 1028.7mm9.20kgs
KTS0762' 6" transom series 762mm5.50kgs
KTS0561'10'' transom series 558.8mm4.50kgs

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:looking for a scaffolding job in dubai can anyone help?
Hi, we are Dubai based scaffolding contractor.
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:Hester Prynne on the scaffold?
she was on it 3 times once as her punishment for adultery. then at night with pearl and dimmesdale when he was acknowledging his crime and then at the end to hear what is happening at the election or whatever it was. she was the only one up their (putting her at a higher level then the rest of society) and she was still there with dimmesdale when he died.
Q:Scaffold climbing law?
That first answer is correct. When I worked as a construction electrician back in the 1980's the OSHA requirements were not so strict, but now the harnesses and tie-offs are required for any work platform over 6' from the ground.
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m
Q:how long should i wait to change my scaffolding piercing?
Industrial piercings take 9-12 months to heal completely and you never want to remove an unhealed piercing unless the jewelry is causing problems and at that point it should be done by a professional in a sterile environment. Taking the jewelry out before it is healed could cause it to close up, become infected or irritated, and can cause hypertrophic scarring (scar tissue) to form on your piercing. I took my industrial out after having it for 3 months. It was out for less than a minute and when I went to put it back in it went through the first hole easily but wouldn't go through the top hole no matter how hard I pushed. It immediately started bleeding and hurtling like crazy. Awesome. Waste of time, pain, and money. So, you might get lucky and just have it get a little irritated or prolong the healing time by changing it early. But you could also end up like me or worse, with any infected piercing. Why risk it?
Q:Should you twist and Industrial/Scaffold Piercing?
mine told me to twist it....i twist it like every day haha. nothing bad has happened
Q:Does a scaffolding piercing hurt?
You sound like you have a low tolerance for pain if you say you're a wimp haha, which means yeah it'll probably hurt you. It'll hurt more than the lobes because it's cartilage, and for the same reason you'll hear a popping noise as the hole is made. You won't be taken over by deathly pain or anything like that, it'll probably be sensitive for a few days after too so careful not to knock it against anyone/ anything. But if you want it bad enough, the pain will be bearable.
Q:Bowl buckle scaffold inspection and evaluation
Bowl buckle scaffold should be checked and accepted as follows:(1) access to the site of the bowl buckle frame fittings shall have the following information:
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Scaffolding specification 1Safety code for scaffold construction:Section 1 fastener type steel pipe scaffoldSpecification for scaffolding, scaffold construction scheme, door type scaffolding specification, door type scaffolding construction scheme, mobile scaffolding specification,This technology is applicable to a set of steel pipe fastening structure as the main body, to make bamboo scaffolding outside the fence.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range