Accessories for Partition Steel Profiles

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications:


1. Material: Galvanized Steel Sheet

2. Items: Crab connector, U-shape, Wall angles and etc.

3. Size: Standard or customized

4. Thickness: Standard or customized

5. Use: For steel profile (ceiling and partition systems)


Feature:


1. Light weight, high strength, safely;

2. High zinc coating, moistureproof, fireproof;

3. Easy and fast for installation, time-saving;

4. Durable, long time life;

5. Recyclable, environment friendly;

6. Can supply products based on specific requirements;

7. Prompt delivery, high quality, competitive price and complete sets of style;

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:140 square meters light steel keel double gypsum board ceiling fee, material costs about how much money
The general cost of about 4,000 materials, first-line brand of materials costs around 7000, labor costs about 3000-4500 between ...
Q:Seeking: light steel keel mineral wool board ceiling, the general how much money a square?
First to correct your mistake on the argument, the installation of mineral wool board dragon skeleton is called paint keel, rather than light steel keel. Second, the current market in Chongqing market point of view, Long card and Star USG mineral wool board is better, plus paint keel matching system and auxiliary materials (screw, expansion sets, T-type hanging pieces) and labor costs, loss , Management fees, etc., estimated at 48 yuan / square or so. For more information, please contact: Chongqing letter Lan Lan Fort Building Materials Co., Ltd.
Q:Decoration light steel keel ceiling in the side of the keel main keel vice keel What is the meaning?
The main keel is generally carrying keel, vice keel is connected to carry keel and gypsum board, while the keel is used in the wall around to fix the main keel
Q:Construction schedule of light steel keel ceiling
Two woodworking a painter, measuring the elastic line, punching the security boom, the main, the second keel day, adjust the reinforcement keel, install the gypsum board, screw rust treatment, paste kraft paper (caulking) one day. Putty (at the end) playing sandpaper on the wall paint (three at the end of both sides), a total of five days, two carpentry two days, four days of paint workers.
Q:Master ceiling should choose what specifications of light steel keel
The main bone C60 is shown on the chart
Q:Light steel keel ceiling The first main keel distance from the wall should be how much?
Thirty centimeters This is the standard necessary distance
Q:Ecological wood veneer gypsum board closed light steel keel ceiling decoration drawings so what is the meaning?
The gypsum board closed should refer to the ceiling, behind the "light steel keel" is "special" indicate that the use of the ceiling required to use the "green gauze board" Keel is "light steel keel".
Q:Light steel keel roof anti - support
Anti-support can play what role
Q:Light steel keel ceiling construction some of my hair
The best on the network to find it
Q:Light steel keel ceiling one square meter how much money
1, installed boom When the floor is a prefabricated board, the hoisting hooks of the suspension boom are embedded in the slit, as long as the upper end of the boom can be bent through the hook hole. When the floor is a cast-in-place plate, it should first release the position of the embedded parts at the bottom of the floor. Use the nail to fix the embedded parts to the bottom of the floor, and bend the upper ends of the boom through the rings of the embedded parts Can be. 2, loaded big keel The large keel vertical hanging pieces, such as a number of sets of dog keel, the big keel handed up, so that the lower end of the boom into the large keel vertical hanging pieces on the hole, plus nuts initially screwed. According to the ceiling of the room in the cave from the arch height (generally take the room to ask the short span of 2: 0), calculate the big keel hanging point at the arch value, twist the nut so that the big keel arch arch, after adjustment , The big keel vertical hanging pieces fastened. 3, installed keel Will be in the keel vertical hanging pieces, such as the number on the big keel, the dragon handed up, so that the keel buckle in the vertical hanging parts of the keel. If the keel intersects with the brace, the keel is placed on the middle keel and the cross brace is in the middle of the keel. Light steel keel ceiling price and construction steps on the finished, you all understand it? For light steel keel ceiling price you can according to their own needs to buy.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range