• Access Panel For Ceiling Quick installation System 1
  • Access Panel For Ceiling Quick installation System 2
Access Panel For Ceiling Quick installation

Access Panel For Ceiling Quick installation

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
500000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Construction:
•Inner frame: High quality extruded aluminum alloy(A6063).
•Out frame: High quality extruded aluminum alloy(A6063)
•With gypsum board

 

 

Attributes:

 1.Easy and quick installation,fixing by screws or clips.

 2.High-class quality, perfect design, light weight but strong bearing capacity,

 3.Mildew resistant, does not change color,corrosion proof,long life,light weight, no weld, and low cost.

 

Description:
•The frame are high quality extruded aluminum sheet construction with advantages of corrosion resistance and rigidity.
•It consists out frame and inner frame. The inner frame is fixed to the out-frame by hinges on one side and by screw on the other side..with elephant nose lock. With gypsum board
•The frame can be easily open to allow for maximum flexibility in the installation, maintenance.

 

Surface Finish:
•Powder coated color finish as per RAL color---- standard color: RAL9016

 

Character

Easy and quick installation
Continuous one-piece frame with feathered edge
High-class quality, perfect design, light weight but strong bearing capacity, no rusting and keeping forms.
Mildew resistant.

 

FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

Picture

Access Panel For Ceiling Quick installation

Access Panel For Ceiling Quick installation

 

Q:Plastic door and window frame dirty not clean how to do?
This is simple, you can pour a fine on the scouring pad, and then rub a clean
Q:Sliding doors and windows to prevent shedding measures which
According to your estimate, it should be your plastic steel windows and doors fixed position is not caused by a straight line. First of all, you first pull the sliding doors and windows you can slide the doors and windows under the wheels of the padding things and then screw into the screw. And then loaded up.
Q:Lead alloy doors and windows of the joints how waterproof
First, the aluminum alloy windows and doors water seepage analysis 1. doors and windows of their own water seepage 1.1 their own closed lax; 1.2 own drainage system drainage is poor; 2. doors and windows installed improperly generated cracks, resulting in seepage 2.1 windows and doors frame deformation caused by the wall with the The gap between the windows and doors and the wall between the wall of the filler is not uniform, and the resulting gap
Q:Autoclaved aerated concrete block construction requirements in the doors and windows on both sides of the puzzle and blocks and other high-width C15 prefabricated concrete block, what is the length of it?
Length is generally 10cm ~ 15cm, specification is not required
Q:Rough room provided by the heat of the aluminum alloy doors and windows frame color is dark green, hoping to change to white or black. Do not know what method can be achieved? 1, paint? Will it fall off? 2, see someone online that can change the color foil, do not know what kind of film? More
You can change the color of the film, but before the installation can be made, or only paint.
Q:What are the key points for the production and installation of wooden doors and windows?
The production of good icu you and the size of the hole to the size of what accessories, i sealed ah! and many more
Q:It should be renovated in 2000, the quality of the wall is still very good, is a bit dirty, the windowsill paint has been completely sunburn, polished and then paint it? Question added: in the end which first? Answer how it is the opposite
The first brush which will do, but attention can not be carried out at the same time, because it is easy to react so that the wall turns yellow. The windowsill paint can be polished after painting, but pay attention to the chemical properties of paint, not the same type of paint is easy to chemical reaction, it is best to find a professional oil workers look and then buy paint. In addition, it is recommended to change the windowsill into stone, or later will be dry skin.
Q:Do the doors and windows first do the inside and outside the wall plaster?
Sure to do the inside and outside the wall plaster, and only plaster over, in order to determine the size of the window, so as to customize the doors and windows, do not forget to stay at the door when the retaining angle.
Q:What are the steps behind the construction of the building after the closure?
The frame is made up of the staircase or the staircase. Mixed structure: do ash cake, elastic line, ready to accept and install the door frame.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords