8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale



Tower crane Specifiction

8tons Tower Crane QTZ125 (TC6015) Good Price for Sale

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What does a track type tower crane look like? In that case, use?
The track type tower crane is like thisUsually use goods or fixed goods yard in shipyard. Hoisting use
Q:What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical.
Q:why do whooping crane migrate?
It is freezing cold in the upper Midwest during the winter. Whooping cranes simply cannot find any food, even if they can endure the cold. During the summer, the upper Midwest has longer daylight hours and slightly cooler temperatures. than their wintering grounds in Florida. The longer hours allow them and their young more time to gather food. Reproduction is very taxing on the female body, even if it is just laying eggs. The young need the extra time and nutrition to grow quickly into adult sized birds. Small birds are more vulnerable to predators.
Q:What is cost of 2000 ft of crane runways?
the only 5'6 girl I know of who did runway was Devon Aoki. Everyone else is at least 5'9+ except Kate Moss who is 5'7.5. The average height for runway is 5'10
Q:how a tower crane for a high rise building construction is erected?
Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Q:what are The performance parameters of tower cranes?
The technical performance of tower crane is expressed in a variety of parameters, the main parameters include the range, starting weight, lifting torque, free height, maximum heightand so on; its general parameters are: a variety of speed, structure, weight, size, tail size and gauge wheelbase, etc.
Q:Hi,what are crane swivels and fishing swivels.
Yes okorder.com/
Q:When installing crane gold 1.6 roller rockers on an lt1, do you use any of the original rockers?
I'm not sure with the LT1 - I didn't go with the crane units on mine - but are the studs correct for the crane application? I know on some of the applications you need to swap over the studs. Give the crane tech folks a call, and ask them.
Q:How much do you know about construction cranes??
that depends, what do u need to know
Q:NYC crane status post-Sandy?
My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range