8T Tower Crane In India with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of 8T Tower Crane In India with CE ISO Certificate

1,The tower crane is advanced in parameters,

2,reliable in performances,

3,beautiful in appearance,

4,high in quality,

5,simple in structure and easy in operation.

6,It is equipped with advanced safety devices and is easy for repair and maintenance, safe for use and reasonable in pricing, for which it has become an ideal choice for many construction enterprises.

Main Features of 8T Tower Crane In India with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

Tower crane Specifiction 8T Tower Crane In India with CE ISO Certificate

8T Tower Crane In India with CE ISO Certificate

FAQ of 8T Tower Crane In India with CE ISO Certificate

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is tower crane? What are the types and features?
[definitions]Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163.comHttp://www.cqybjs.com (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
Q:What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
It must be installed:To prevent the trolley cable broken car slip away;The car must have a support wheel to prevent the trolley from hanging in the middle.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
How to choose tower crane in engineering:1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:What is the difference between crawler crane and tower crane?
Difference:1, tower crane tower body (lower) stand up like a tower, so called tower crane; crawler crane slewing below is tracked chassis, like crawler tractor chassis.2, tower cranes are generally used in high-rise building construction, lifting and attaching, arm pole is very long, construction site is very common. Crawler crane is used in municipal engineering, such as subway, bridge and so on.3, the tower crane jib with flat arm, arm, is mainly composed of steel frame. Crawler crane boom is mostly steel frame, similar to the tower crane boom.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:How to fix the cable on the tower of QTZ125 type tower crane?
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,
Q:Who invented the tower crane, please?
In 1923, a prototype of modern tower crane was built. The first relatively complete modern tower crane appeared in the same year. Our tower crane started from Shanghai in 1950.
Q:Ask about the lift and transportation of the jack up tower crane
This problem is built in quality [2009]. Clause 87 has provisions.
Q:What is the rental price of a tower crane? General site rental more, but also buy more? Ask the industry for an answer?
The rental price of tower crane consists of the cost of advance and retreat yard and the monthly rent of tower crane. The cost of the advance and retreat yard includes the loading and unloading costs, transportation costs, installation costs and monitoring expenses of the tower crane. The rent of the tower crane includes the cost of tower cranes, the cost of tower crane maintenance and the wages of the crane drivers. At present, many sites are using lease way to use tower cranes, so that the occupation of the site will be less rent, investment will be relatively small.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range