8T Self-rised Tower Crane with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of 8T Self-rised Tower Crane with CE ISO Certificate

1,The tower crane is advanced in parameters,

2,reliable in performances,

3,beautiful in appearance,

4,high in quality,

5,simple in structure and easy in operation.

6,It is equipped with advanced safety devices and is easy for repair and maintenance, safe for use and reasonable in pricing, for which it has become an ideal choice for many construction enterprises.

Main Features of 8T Self-rised Tower Crane with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate



Tower crane Specifiction 8T Self-rised Tower Crane with CE ISO Certificate

8T Self-rised Tower Crane with CE ISO Certificate

FAQ of 8T Self-rised Tower Crane with CE ISO Certificate

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:is it possible to make an origami crane that can fly like paper airplane?
I think of myself greater because of the fact the paper plane sort.....going with the breeze and letting it take me the place it is going to. additionally, cranes are no longer very severe-high quality once you get too close to to them and could attempt to %. your face off in case you verify out them humorous.
Q:When you make 1000 cranes, do you have to wish on the spot? Or can you save it until you think of something?
wait, you folded 1999 paper cranes and you still didn't have enough time to come up with a wish? I recommend that you wish to become more decisive...
Q:Location of White Naped Crane?
it's not a map but it tells where theyre habitat range is.
Q:What do Blue Cranes eat?
What Do Blue Cranes Eat
Q:How does a crane make work easier? ( In the scientific way, Force x Distance... you know)?
The type of crane she is referring to ia a simple pole with a fulcrum placed between the person operating the crane, and the mass to be lifted. Imagine a weightless pole with a rope tied to one end attached to a mass of weight 224 lbs The pole is 9 feet long Let's say the human weighs 112 lbs, or half of what is to be lifted. Without a crane, it will be difficult to lift that much and swing it around. With the crane, though, let's look at the advantage when a fulcrum is placed under the pole and the person pushes down on the pole to lift the weight. First, note that gravity is in favor of the person to use their weight on the pole. Using physics, with the fulcrum place at x from the mass to be lifted, the downward force of the person is F*(9-x)=224*x or F=224*x/(9-x) now plug in some values for x and compute the force: x F 4.5 224 3.5 143 2.5 86 1.5 45 0.5 13 I started by placing the fulcrum exactly in the middle and then moving the fulcrum in increments of 1 foot closer to the weight to be lifted Notice that the more pole towards the person pressing down, the less force the person has to apply to lift the weight. Also, note that when the fulcrum is in the middle, the person must apply a downward force equal to the weight - which willl be difficult foir a person that weighs 112lbs. However, once the fulcrum is placed 2.5 ft from the weight, the person only need apply 86 lbs of downward pressure. Leverage. j
Q:What is the process for sizing a crane?
As you won't be building your own crane (that would be stupid since you would be fully liable). Call a crane vending/renting company. They'll be more than eager to provide you with technical council. How you pick a crane? What do you need to do with it - type of crane for instance -Moving stuff around in a warehouse, yard,.. always at the same places = overhead crane -Lifting heavy stuff once (for instance another crane) or for a short period - mobile crane -lifting stuff for a longer period but not permanent (construction) = tower crane How much do you need to lift, what can it cost? ... It's al pretty simple
Q:How do you build a crane!?
Carefully. okorder.com has kit numbers and downloadable instructions for many Lego cranes. You might be able to find some of them on OKorder. You may not need to actually build the Lego crane. Instead, look at the model, determine the major pieces (wheels, turntable, arm, etc.). Then, look at your bundle of pieces and make something with the same function.
Q:how do they erect those large tower cranes you see on big building projects?
with another crane. assemble the tower first in sections, assemble the jib on the ground then lift it into place
Q:What are the characteristics of a tower crane?
Classification and characteristics of tower cranesAccording to whether or not there is a walking mechanism, it can be divided into movable tower crane and fixed crane.Mobile tower cranes can be divided into four types: track type, tyre type, automobile type and caterpillar type according to the difference of walking device.The track type tower crane tower body is fixed on the walking underframe, and can be operated on the specially designed track. The utility model has good stability, can walk with load, and has high work efficiency, so the utility model is widely used in construction and installation engineering.The wheel type, the automobile type and the crawler type tower crane have no track device, and they are easy to move, but can not walk with load and have poor stability.The fixed tower crane can be divided into two types: the attached self lifting type and the internal climbing type according to the different installed positions:The attached tower crane can rise as the building rises. It can be applied to the high-rise building. The structure of the crane can only bear the horizontal load from the crane, but it is easy to use, but it occupies more steel structure;The internal climbing crane in the interior of the building (elevator, staircase), up through a set of system and improve the lifting bracket, is complicated, but occupy steel less, do not need to be installed, all the weight and load by building bear.
Q:Stephen Crane's war beliefs?
The Pluralistic Philosophy of Stephen Crane by Patrick K Dooley - 1994 The Poetry of Stephen Crane by Daniel G Hoffman, Professor Danlel G Hoffman - 1971 - 304 pages the sources of Crane's philosophy and art are as yet undeciphered I know he was a son of a Pastor, did not live long and I never liked his RBC book (Red Badge of Courage RBC the term for red blood Cells), but hope the above help.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range