595*595 easy-cleaning gypsum ceiling tiles from China

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
10000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Material: Acrylic Feature: Fireproof Position: Interior,Exterior
Thickness: 8mm,9mm,7mm Wildth: 60cm Fonction: Normal Ceiling,Fireproof Board Ceiling

Product Description:

Product Description:

Gypsum ceiling tiles are made of incombustible gypsum board, PVC facing as well as aluminum foil backing. The aluminum foild backing has thermal insulation properties while the PVC facing provide you various choices with different designs.

 

Product Applications:

Indoor decoration: such as school, hospital, restaurant shopping mall and so on.

 

Product Features:

Edge: Square

NRC:0.1-0.3

Combustion Property: ACCORDS TO GB8624-1997

Light Reflection Property: 0.75

Humidity Resistant Property: Up to 95% relative humidity

Moisture content: ≦2%

         

Product Advantages:

  1. Fire resistant

  2. Easy cleaning

  3. Safe and environmentaly healthy

  4. Light reflection

 

Product Specifications: 

1. It is an environmentally-friendly building materials, which is good for the environment.

2. Because of the PVC facing, customers could have various design choices, not only for the pattern, but also for the color.

 

FAQ:

Qustion1: How can you guarantee the quanlity of your products?

Firstly, our company listed Forture top 500, so we have high reputation in doing business. Secondly, we make our products according to the standards, and if you want to go and see our factories, it is ok and we will welcome you!

 

Question 2: Where is your factories?

Our factories in different areas of China, such as Shandong Province, Hebei Province, etc.

 

Images:

 

595*595 easy-cleaning gypsum ceiling tiles from China

595*595 easy-cleaning gypsum ceiling tiles from China

595*595 easy-cleaning gypsum ceiling tiles from China

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Gypsum board ceiling scraping putty treatment and preparation work
Work: 1, wall treatment of the scraping putty The general wall scraping 2 putty can be, the flatness of the wall requires a lot of local scraping several times, more serious need to find plaster leveling, each putty scraping need to be more than 2 hours. 2, repair the wall to deal with the putty polished After the putty scraping, polished, you can at night, with more than 200 watts of light bulb close to the wall, while grinding side view flatness. Polished easy to produce a lot of dust, need to do a good job wearing masks and so on. 3, the decoration of the wall to deal with the brush primer The dust on the wall putty putty clean, the primer evenly brushing, waiting for the primer dry. 4, repair the wall to deal with the brush finish Under normal circumstances, the topcoat usually need to brush twice, the first pass to wait for its drying only need 2-4 hours. The second time it takes 1-2 days after the job.
Q:How To Identify Gypsum Celings?
The ceilings are usually very flat and smooth. Gypsum can be white, but almost all gypsum ceilings will be pink. The easiest way to tell would be to scrape a small piece of the paint off, if the ceiling beneath is pink, you have gypsum!
Q:Gypsum board two faces which face up to install the ceiling
Seal processing (1) modulation of one-component caulking plaster putty The container used for modulation must be clean. According to the provisions of the proportion of the first clean water will be poured into the container, and then slowly to the water cast gypsum powder, let it swell 5min, and then stir the stir bar into a slurry without caking thick slurry, Modulation of a good pulp, can no longer add gypsum powder, so as not to agglomerate. Generally applicable to the construction time of 45min, more than time to start solidification, can not be used. (2) Board edge treatment The edge of the sheet is not treated, and the cut edge of the board should be treated as follows: Before the board is installed, gently press the front edge of the cardboard side and then use the knife Chamfer the side of the paper to pick the upper layer, and pick the open face paper torn, pay attention to the gypsum core can not be exposed, this part still keep the paper under the paper. (3) capping process With a small scraper will be stitched putty evenly embedded in the lower part of the gap between the joints, so putty squeeze the back panel side, to form a protruding putty along the mouth, so that the edge of the board with the stopper putty more firmly. Until the putty completely dry, with electric or manual sander, No. 2 emery will be slit plaster putty polished. And then with the entire paper gypsum ceiling decoration construction.
Q:Gypsum board ceiling with putty put it?
Work: 1, wall treatment of the scraping putty The general wall scraping 2 putty can be, the flatness of the wall requires a lot of local scraping several times, more serious need to find plaster leveling, each putty scraping need to be more than 2 hours. 2, repair the wall to deal with the putty polished After the putty scraping, polished, you can at night, with more than 200 watts of light bulb close to the wall, while grinding side view flatness. Polished easy to produce a lot of dust, need to do a good job wearing masks and so on. 3, the decoration of the wall to deal with the brush primer The dust on the wall putty putty clean, the primer evenly brushing, waiting for the primer dry. 4, repair the wall to deal with the brush finish Under normal circumstances, the topcoat usually need to brush twice, the first pass to wait for its drying only need 2-4 hours. The second time it takes 1-2 days after the job.
Q:Ceiling with cement board and gypsum board that board is better!
Cement board is used to heat, do a class of partitions, the top can not hang the finish paint. Gypsum board is used to decorate the wall surface, used to flatten the wall. They are of two nature. You can install a layer of cement board in the ceiling for insulation. And then do light steel keel to be a gypsum board ceiling. Cement board and gypsum board are two kinds of properties that can be installed at the same time. Their function is different.
Q:6 square kitchen, with integrated ceiling, or with aluminum buckle board good?
Certainly pvc aluminum buckle affordable ah ~ In fact, aluminum buckle is not beautiful but the price is placed there. The integration of the cheapest also about 70 a level ~ the price or our design company getting goods prices. Aluminum buckle cheap you buy 30 is enough. The quality you do not have to consider ~ on the top will not be bad. And will not be installed with a stick poke poke try
Q:Will the gypsum board ceiling tube hole how to open
Downlight There are a lot of sizes and specifications you need to install the shape of the installation of the master will help you open well
Q:Decorative light steel keel how many flat for an inspection lot
The same variety of ceiling works every 50 (large area rooms and corridors by ceiling area of 30m2 for a) should be divided into a inspection lot, less than 50 divided into a inspection lot. According to each level or each layer of construction (or deformation of the seam) as a test batch, high-rise building standard layer for every three (less than 3 layers by 3 layers) as a test batch. Before the construction and supervision units together with the inspection lot, determine the number of inspection batch.
Q:Gypsum board ceiling how much money a square?
If it is on a daily basis, the workers are not lazy, and the area is relatively large, the site construction conditions are better, you are not much difference in price. But generally small works. The price can talk about 100, 80 even if the good, and now the second-tier cities Bao Gong Bao materials are reported 180,120 this price
Q:With gypsum ceiling, in the dining room to install ceiling fan lights, how to reserve the location?
Connect the power cord: 1. Connect the ceiling fan outlet cable and the power cord with the terminal. 2, the power supply negative (-) line ceiling fan white line, power positive (+) line connected ceiling fan black line. 3, ceiling fan blue line for the light line and ceiling fan should be connected to the black line of positive power (+) line: or wall switch to separate control lights. Six, the installation of hanging clock: 1, the first hanger on both sides of the hanging bell fixed screw out 2-3 teeth, without complete exit. 2, as shown in the direction of the arrow in the direction of the arrow will be the clock on the screw and the right to the right to rotate to the fixed point (the left), and then screwdriver locking screw to complete the fixed bell. Figure 7, switch switch: 1, pull-type switch control ceiling fan high, medium and low three speed. 2, forward and reverse switch control blade rotation direction. 3, the blade counterclockwise rotation when the wind blows down for hot days or with the use of cold air; leaf counterclockwise rotation when the wind blow down for cold or with the use of heating, and can be used as indoor air conditioning convection role. 4, power if the ceiling fan does not turn, please pull the pull switch, or forward and reverse switch. 5, reversing switch can not be cut in the middle, should be cut to the top or bottom. The ceiling fan will not rotate when it is in the middle.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range