• 5/6/7 Feet Tall Steel Frame Type Scaffolds Whole Sale CNBM System 1
  • 5/6/7 Feet Tall Steel Frame Type Scaffolds Whole Sale CNBM System 2
5/6/7 Feet Tall Steel Frame Type Scaffolds Whole Sale CNBM

5/6/7 Feet Tall Steel Frame Type Scaffolds Whole Sale CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

Application: For house bulding

Certification: SGS

2.Packaging & Delivery

Packaging Details:

Delivery Detail:

Steel tube is packed in bundles with steel strips; coupling is packed in   carbons.

20 days after the deposit

Durable steel scaffolding systems tube&coupling

3.Feature Details

1. Scaffolding systems tube&coupling is one of the most labor intensive scaffolding systems,but the return on time investment is nearly umlimited adaptability and access to even the most unique jobsite.

2.The normal size of scaffold tube is 5.8 meter long,diameter 48mm. It is compatible with scaffolding couplers 48.6*48.6mm or 48.3*48.3mm.

3. Scaffold tube can be joint at any angles you want with three simple components:fixed coupler,swivel coupler and sleeve coupler.

4.The steel scaffold tube are mainly used to cover the outside wall of building,adaptable to any construction situation.However,they are also suitable to support inside concrete walls.

5.The thickness of scaffold tube can be 3.2mm,3mm and 2.75mm,the surface can be black,painted or cold galvanized.

4.

Main Frame
Code Thickness(mm)Height(mm)Width(mm)Surface Treatment
HF1930      2.0/2.219301219HDG/Painted
HF170017001219
HF 152415241219
HF17091700914
LF170017001219
LF121912191219
LF9149141219
LF152415241524
LF193019301524

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

5/6/7 Feet Tall Steel Frame Type Scaffolds Whole Sale CNBM

Q:Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
Oh, that love what the lay it? Concrete is the end of the concrete pumping equipment, the role is to pump the concrete through the pipeline to be poured to pour (to say that the "building" is the word is also lay it, huh, huh) components within the template
Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
the HOW is that if he moves 1/6 of the way to an end, then he's 1/3 of the way from that end and 2/3 of the way from the other end. The tension from the platform doesn't change, but the tension from the man on either rope is inversely proportional to his distance from either end; in other words, he's 1/3 of the way from the right end, so 2/3 of his mass goes to tension on that rope; he's 2/3 from the other end so 1/3 of his mass goes to tension on the left rope. the rest is just math!
Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q:How to carry out fire inspection at construction site construction site (including information and site)
the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
System, and to monitor the implementation of the situation
Q:What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
That is, the upper and lower with a pump on the 90-degree bend, the two of them with the root 1 m straight tube connected to each other, and the other round steel to do two large diameter 18 meters, and then some straight round 2 large circle made of a hoop, and then the two straight with elbow straight fixed Below the elbow tow pump up the pump tube, the top elbow root 2 m straight tube It can be in the range of 4 meters to rotate the fabric, such as to move the car can be used in place
Q:Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety
Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords