3 way Stractly Square Air Diffusers Vent for HVAC Systerm

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
999999 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

  

 1

Item

HVAC aluminum air conditioner grille

 2

Materials

Extruded Aluminum alloy (6063-T5)

 3

Blade

Blades in 45°from aluminum profile or as customer’s requirements

 4

Bar spacing

30mm as standard or as customer’s requirements

 5

Materials

0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ 

 6

Surface Finish

Powder coated, Anodized , PVDF, Mill finish.

 7

Size 

Width x Height, any sizes available

 8

Powder for Finish

Environmental protection and non-toxic, and Color to keep 5 -10 years.

 9

Color

Refer to RAL colors swatch or customized colors available

 10

Design

Drawings designed according to the customers’ requirements

 11

Payment terms

T/T, L/C, PYAPAL, etc.

 12

Delivery time

Usual 15-20 work days for a 40GP container 

 13

Package details

Bubble wrap + Cartons for FCL,  Bubble wrap + Cartons + Wood-box for 

 14

Mesh

Stainless steel security mesh, Aluminum security mesh

 15

Type

Fixing and adjustable installation


Pictures shown


3 way Stractly Square Air Diffusers Vent for HVAC Systerm

3 way Stractly Square Air Diffusers Vent for HVAC Systerm

3 way Stractly Square Air Diffusers Vent for HVAC Systerm

3 way Stractly Square Air Diffusers Vent for HVAC Systerm

3 way Stractly Square Air Diffusers Vent for HVAC Systerm

3 way Stractly Square Air Diffusers Vent for HVAC Systerm

 

Usage of Air Diffuser 

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.

 

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the role of heating water tank?
The role of heating water tank to provide living water, to provide life heating
Q:Radiator parallel system how to take pictures
Radiator in parallel 1: radiator parallel 2:
Q:To warm the company which installed the best
To warm the installation to consider a lot of factors, or please warm the company to warm it
Q:How to use the Hilbo boiler
There are ah manuals
Q:Do you have a good geothermal cleaner?
OKorder workers to warm the washing machine is very good operation, the Internet has a video operation. The specific operation steps are as follows: 1. Close the manifold main control valve and also open the sub-valve is also closed. 2. Place the drain on the side of the divider and install the quick connect. 3. The host pulse output, inlet pipe, water separator sewage pipe connected. 4. Check the various parts of the connection is not leaked open cleaning. Cleaning pipe Note: 1. The connection must be tightened to prevent leakage, must be inserted in the end of the tube, when the card must be broken to the end of the ring. 2. The drain end must be inserted into the sewer mouth to prevent contamination of the environment when it is discharged. 3. Before cleaning, be sure to ensure that every road to warm pipe without discount. 4. Cleaning should pay attention to the pump pressure to prevent the pipeline blockage pulse generator can not work properly, to stop the work analysis reasons. 5. The pulse generator found that there is leakage of water leakage phenomenon should stop working troubleshooting. 6. If you encounter the construction environment in the water source can be more distant piping connection.
Q:Do you want to stretch your feet at every door?
Q:What is the basic task of heating engineering?
The basic task of heating engineering is to meet the needs of the heat load components: heat, heat, hot users
Q:Do you want to turn off the water return switch when the geothermal pipe is exhausted?
Geothermal (floor warm) water separator: We are exposed to the only equipment, but also we need to operate the exhaust equipment. Divided into the supply (into) water pipes and back (out) water pipes, in general, the top of the water supply pipe, the bottom is the return pipe, each have a valve, the ball valve: the horizontal direction is open, vertical helium float Feng Tong Feng is off. Gate valve: screw clockwise screw is off, counterclockwise twist is open. Another tool: a soft leather tube, the size and exhaust valve port similar to the elastic, can be tight in the exhaust valve port, to prevent the discharge when the pop, affecting health. A basin. 1. It is best to determine the exhaust in the normal heating 2. The best one by one system exhaust, in the geothermal first run process, because the pipeline pressure and water resistance is easy to produce air plug, resulting in water supply is not recycled, the temperature is not equal , Should be carried out by road exhaust. The method is: turn off the heating of the total return valve and the loop control valve, (the total return valve in front of the water separator, the pipe below the tube, the low temperature of the pipe is the return pipe.) First open the water separator A control valve, and then open the drain on the drain valve on the exhaust valve exhaust, drain the air and then close the valve, while opening the next valve. And so on, each way the air is drained and then all the valves open, the system is running. 3. The number of exhaust and heating are directly related to the length of time, such as running water and heating time, just started heating and fast heating because of heating time is short, circulating pump and heat transfer station also has time to stop, easily lead to gas block, so everyone Should be more exhaust, generally completely after a gas can be. In the later exhaust do not have to close the valve, you can directly discharge a small amount of air
Q:Carbon crystal to warm the use of it, what advantages and disadvantages is ah
Eagle song carbon crystal to warm from the quality to the price, as well as security, aftermarket are very good, you can understand the understanding....
Q:Discusses the working principle of home split air conditioning and draws the schematic diagram
I've learned that my book is there. I also have annotations to explain.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range