2Ton Wheel Loader, 2Ton Front End Loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick details:

Condition: New

Brand Name: CCMG

Model Number: LW200

Place of Origin: Liaoning, China (Mainland)

Type: Front Loader

Moving Type: Wheel Loader

Dimension(Long * Breadth * High):5565*2000*2850mm

Rated Load: 2000kg

Certification: CE, GOST

Warranty: 12 months, 2000hrs

After-sales Service Provided: Overseas service center available

loading bucket: 1.0m3

engine power: 60kw


characteristics of 2ton wheel loader :

  1. Adopt Cummins 6 cylinder engine with 97KW output power and high torque, strong excavating capability.

  2. Full dydraulic steering system, merging of double pump, energy saving and high work efficiency.

  3. Increase the counterweight, improve the stability and bearing capacity of the complete machine.

  4. Reinforcement structure. Strengthened front and rear frame.

  5. Joystick control realized precise operation, air conditioner are option.

  6. Joystick control realized precise operation, air conditioner are option.

specification of the wheel loader:

2Ton Wheel Loader, 2Ton Front End Loader

2Ton Wheel Loader, 2Ton Front End Loader



2Ton Wheel Loader, 2Ton Front End Loader

2Ton Wheel Loader, 2Ton Front End Loader

2Ton Wheel Loader, 2Ton Front End Loader

2Ton Wheel Loader, 2Ton Front End Loader


FAQ:

1.How about the shipment?

1. The loader machine load one 40HQ container.

2. The loader disassemble into 3 parts, major machine, bucket and cabin.

3. Before shipment, we have done the rust-proof and antiseptic treatment.


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3. What Can we Do For You?                                                                 

1. During the period of 12 months or 2000 working hours warranty, Chaogong factory are responsible for maintenance and replacement of spare parts.

2. We attend the machinery exhibition in your country and please contact us when we are with you at that time and solve the problem you have.

3. For the sole agents, we will go with senior engineer to your country and offer the technical service. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When is a good time to build a new computer from a deals standpoint?
Building a computer is great, and it'll be a great time to build in the next few months. Why? Intel is preparing to release Sandy Bridge after the recent recalls. AMD is preparing to release bulldozer, and I think the Llano CPU/GPU will be sometime soon too. This means 2 things will happen: 1: Unlike before, AMD and Intel will likley be in fierce competition in the coming months. Unlike the old and expensive intel i7s, which had no competition, Sandy bridge and Bulldozer will hopefully be competing in the same market and price range. This means prices will come down to reasonable levels. 2: As prices for new chips sink, the prices for old CPUs Like the i5-760 and Phenom II x4 or x6 are going to plummet fast as they suddenly become outdated. That mean you can buy a previous generation, but still really good CPU for a rock bottom price when the new processors come out. Also, bulldozer and ivy bridge motherboards will be compatible with future processors. Build now, and you won't have many good upgrade paths. So if I were you, I would just sit back and wait for the mad Sandy Bridge and Bulldozer rush and watch prices of old Phenoms fall.
Q:Car rear end, the reason is not in front of a bulldozer tail lamp, who is responsible for the night.
The same to scratch the traffic accident1, a party in the lane change process in the same direction scraping traffic accident, change lane side bear full responsibility;2, one side over the other side of the formation of the same scraping traffic accident, and the other side in the lane normal driving, the faster the party to assume full responsibility;3, a super wide and failing to set a clear warning signs, to scratch the traffic accident with another party beyond the process of the formation of ultra wide, secondary responsibility for the accident party, the other party the main responsibility for the accident;4, a super wide and with the other party in parallel or beyond the scratch the traffic accident the other party in the process of super wide shall bear the full responsibility of the accident;5, one side in the driveway to stop the formation of the same direction scraping traffic accident, parking side according to regulations opened the dangerous warning flash, and set a warning sign, the other party bear the full responsibility for the accident;6, one side parking in the driveway, forming the same direction scraping traffic accident, the parking side does not according to regulations open dangerous warning flash and set warning signs, both sides bear the same responsibility for the accident.
Q:Would a neighbor next door running a bulldozer be a legitimate reason to rubberneck?
Curiosity ? You bet . Go oogle . I would . lol Have a good afternoon . D :)
Q:What motherboards could support the eight core AMD Bulldozer processors?
Any AM3+ board will and some AM3 boards will with a BIOS update, although they won't be able to fully utilize them. Good catch, Citizen. I didn't realize that the AM3+ socket had already been fragmented like that.
Q:Who do you think the biggest tool is?
Tom Cruise.
Q:Will a bulldozer clear stumps ?
No, as there's many types of heavy equipment, each serves its own purpose, so before you go out and rent or buy a bulldozer and operator think about what it is you need to do and act on those needs, try a stump grinder first. and better yet find a qualified company with employees that are qualified to operate such equipment, although you driving a bulldozer through your house or your neighbors would make great TV its not very cost effective
Q:How common is it for people to have unwanted violent thoughts?
Does okorder.com/ If on the other hand you are genuinely worried that you will act on these thoughts see a doctor.
Q:I would like to know about maintenance of knowledge used excavators, where you can provide this information?
You want to know all kinds of second-hand excavators, including the supply of information
Q:Even people who told me 6 years of mountain type 160's worth of bulldozer.. Point out in detail
See you in how it is wear, no external wear what to buy their own to repair it, if every part of the car in the garage of the aging but also do not see what can make a good point! Is about two hundred thousand! If the condition is not about me or not recommended to buy, because CVT car late only repair points, can not do what live.
Q:In which department does the driving permit apply for assessment?
The twenty-seventh is engaged in special operations personnel assessment, certification and review the work of the relevant personnel, dereliction of duty, breach of privilege cheating, shall be given administrative punishment; constitute a crime, shall be prosecuted for criminal responsibility according to law. Local units responsible for special operations assessment, not the same, there are Safety Supervision Bureau, labor bureau or quality supervision bureau.The wheel excavator must do the driving license. The driver should do the operation card and driver's license, and the bulldozer needs the operation card. There is the B driver's license and the operation certificate of the production safety administration

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range