2 Years Warranty Newest LED Lamp PC Cover Die-cast Aluminum 5W E27/ E26 450lm 85-265V LED Bulb Light
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 20PCS pc
- Supply Capability:
- 200000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
LED bulb light is designed and manufactured to replace the 60-75W incandescent /Halogen bulb and 19W CFL, the superior SMD LED solution and purity aluminium material makes the luminous efficacy high to 84LM/W, it is of excellently heat managed by conjoint structure which maintains the LED working temperature in a comfortable condition. We promise 2-year-warranty for all the bulbs we manufacture.
Material | Aluminium and PC |
Voltage | AC 85-265V |
Base | E27/E26/E14/B22 |
Operating Frequency | 50-60Hz |
Power | 5w |
Beam Angle | 180 degress |
Color Rendering Index (CRI) | >80Ra |
Correlated Color Temperature | 2000-3500K,4000-5000K,5500-6500K |
Color | Warm White/Natural White/Cool White |
Surface Color | Milky White/ Frosted/ Clear |
Lamp Luminous Efficiency | 80-90lm/w |
Operational Environment | -20°C to +55°C |
Life Span | 20,000hrs |
Certification | CE,ROHS |
Features
1. SMD LED solution, excellent heat dissipation performance.
2. Energy saving perfect replacement for incandescent bulb and CFL, low Energy Consumption.
3. High luminous efficiency as high as 90-110lm/w.
4. Wide working voltage AC85-265V.
5. Particularly designed constant current driver for open or short-circuit protection.
6. Green, No UV and IR Radiation.
7. Environment friendly, no mercury, lead or hazardous materials.
8. Easy to install, E27/E26/E14/B22 are available.
9. Anti-Vibration, convenient for transportation.
10. Certificate: CE, RoHS.
11. Warranty period: 2 years.
Usage/Applications
1. Widely used to replace traditional incandescent bulb, fluorescent light and CFL.
2. Suitable for shopping mall, hotel, restaurant, museums, art galleries, cosmetic counters, show window etc.
Customized options
1. Customized label/ Logo can be made onto Product and Retail Package.
2. Multi colored, cool white and warm white optional.
Packing & Delivery
Package:
1 x Bulb
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory
- Q:LED can the bulb be used in the bathroom?
- of couse Yes, but LED kitchen and toilet light is recommended
- Q:Want to buy a few LED bulb, do not know how to identify the quality of good or bad, ask for solution ~!
- You are not the light source, in addition to a treasure bully ordinary consumers can't tell the difference between good and poor light source, all blow themselves jingyuan. I think you can see for yourself, not necessarily expensive or cheap but wafer, it certainly can not be said. Big power of a simple 1W bar, poor beads 1-3 cents, the wafer will be 1.3-2 dollars. There are several tiles, and how much does it cost?.
- Q:Seeking the production process of LED bulb... Thanks
- 10 points, Baidu wants to be a LED engineer. LZ is a real budget man
- Q:Ordinary lamp LED bulb can?
- As long as the inside of the interface is the same, for example, the E27 interface (ordinary spiral, that can be installed energy-saving lamps) installed there is no problem, LED bulb is now a lot of 110V-220V high voltage power supply, so the stability is very strong, the key is to save electricity, saving seventy percent than the energy-saving lamp, no effect, ease of use.
- Q:What's the cause of the noise during the aging of LED bulb bulbs?
- The power supply LED bulb using miniature low power switching power supply, switching transformer due to loose, and the switching frequency did not avoid the audio area, it will beep.
- Q:LED thread specifications for bulb bulbs?
- Commonly used thread specification: E27 screw.Commonly used household ordinary E27 spiral lamp holder;
- Q:LED what is the plastic shell of the bulb? What plastic material is better? What do you need to pay attention to?
- There are several good LED ball bubble, which with aluminum cooling. Relatively new appearance.
- Q:LED what is the glue between the aluminum base of the bulb and the cooling aluminum?
- A lot of sticky glue can live it yourself have not tried to guess 502 good brothers of this kind of glue can be, but do not know good heat resistance and high power LED heat is still very large, if you are a small power never mind
- Q:Want to find common features, unified purchase accessories repair!
- The most common problem is that 1, the drive power is broken 2, the light source due to excessive or excessive flow leading to necrosis
- Q:LED how does the bulb return electricity?
- What is reflow? Never heard of it. I am a lighting technician
1. Manufacturer Overview |
|
---|---|
Location | Shenzhen,China |
Year Established | 2011 |
Annual Output Value | |
Main Markets | Mid East;Western Europe |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen |
Export Percentage | |
No.of Employees in Trade Department | 20 People |
Language Spoken: | Chinese |
b)Factory Information | |
Factory Size: | Above 4,000 square meters |
No. of Production Lines | About 6 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Cheap |
Send your message to us
2 Years Warranty Newest LED Lamp PC Cover Die-cast Aluminum 5W E27/ E26 450lm 85-265V LED Bulb Light
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 20PCS pc
- Supply Capability:
- 200000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products