2.0-3.6m Tubular steel shoring prop scaffolding for construction

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:

QS-p





Surface finish:

powder coated/galvanized

Raw material:

Q235

Load Capacity:

20-25KN

H.S code:

73084000

Delivery time:

25days



Packaging & Delivery

Packaging Detail:50PCS/PALLET or Loose in container to load more prop in 20or 40GP container
Delivery Detail:25DAYS

Specifications

2.0-3.6mSteel support prop 
1)Reliable manufacturer 13 years 
2)ISO9001:2000 certified 
3)fast delivery time

 

Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props. 

Product Name: Scaffolding Light Duty Shoring Prop Systems

Model Number: QS-L-1000/1700/1900/2000/2200

 

Feature:

1. Made By 48mm Diameter inner tube

           56mm Diameter outer tube

. Made By 40mm Diameter inner tube

           48mm Diameter outer tube

2. Size:

1000mm(Min)--1800mm(Max)

1700mm(Min)--3000mm(Max)

1900mm(Min)--3500mm(Max)

2000mm(Min)--3600mm(Max)

3200mm(Min)--4000mm(Max)

3. Surface finish: Powder coated/Cold/Hot galvanized.

4:top/base plate:120*120*4mm  or 150*150*6MM

5:outer thread prop sleeve:63.5*3.75*135mm

6.OEM offered ,manufactured as per customer’s requirement.

 

Load capacity:1.0-2.5Ton

Type inner thread 

Material: high strengh pipe

Surface finish:powder coated or galvanized 

 

Available Size:

 

Type

Adjustable Length
  (mm)

Outer Tube
  (mm)

Inner Tube
  (mm)

Weight
  (kgs)

20ft Container
  (pcs)

Surface Treatment

Spanish Prop

800-1400

48*1.6*765

40*1.8*835

4.74

3500

Painted,   powder coated, electro galvanized or hot dip galvanized

1600-3000

48*1.6*1600

40*1.8*1600

7.57

2200

2000-3500

48*1.6*1710

40*1.8*2000

8.45

2000

2200-4000

48*1.6*2000

40*1.8*2200

9.32

1750

Italian Prop

1800-3100

56*1.6*1510

48*1.8*1800

9.36

2100

2000-3600

56*1.6*1750

48*1.8*2000

10.29

2000

2200-4000

56*1.6*2010

48*1.8*2200

11.26

1750

Middle East or German Prop

1400-2700

60*2.0*1340

48*2.0*1400

9.45

2300

2000-3500

60*2.0*1540

48*2.0*2000

11.38

2000

2200-4000

60*2.0*1840

48*2.0*2200

12.7

1750

3000-5500

60*2.0*2540

48*2.0*3000

16.51

1500(40ft)


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
Q:Calculation method of complete scaffold
Poetry cannot walk unless it is on the edge of the abyssNo matter where we are, there is always the earth, that is the eternal meeting;
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
hey...i'm trying to figure out the same thing....weird.
Q:Scaffold Piercing Im 15 Help.?
the one you have needs to line up with the one you want, know what i mean. i imagine that most single cartilage piercings are not pointing the right direction to accommodate scaffolding.
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
Q:Mobile scaffolding accessories prices
The price of each region is different, are you renting or buying?
Q:Getting my scaffold (industrial piercing) done tomorrow. Tips?
Tip: don't have it done.
Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q:During what month does Hester mount the scaffold in The Scarlet Letter?
Here is a good analysis and summary from Shmoop.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range