15m3 concrete mixer truck(HOWO chassis)

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Model: CLY5317GJB3

Overall size (mm)

10740 (L)*2500(W)*3990 (H)

Tank body dimension(mm)

6724*2450

Wheel base (mm)

1800+3200+1350

Tread f/r (mm)

2022/1830

Max. Speed (km/h)

86

Chassis

Manufacturer

SINO  Motors. Ltd

Model

ZZ1317N3268W

Steering system

Imported  ZF 8098 hydraulic power steering.

Transmission

Manual

Brake system

Dual circuit air-pressure braking system

High  pressure oil pump

ARK  brand

Hydraulic motor

ARK  brand

Reducer

TOP  brand

Water  supply system

Water  supply by air pressure (450L water tank), homemade sprinkler.

Air-condition

SINO  TRUK special air condition

Engine

Model

WD615.96E

Max. Power (hp)

375

Engine type

L6,Water-cooled,  direct injection, supercharged inter-cooling diesel engine

Fuel type

Diesel oil

Tank body parameter

Mixing volumem3

15

Feeding speed

More than or equal to 3m3/min

Unloading speed

More than or  equal to 2m3/min

Discharge residue rate

Less than 0.5%


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The concrete mixer transporter is running continuously for no more than one hour
The concrete mixer transporter is running for no more than 8 hours. Concrete mixing is divided into two kinds: artificial mixing and mechanical stirring Manual stirring search When stirring, try to be quick, stirring time from adding water, should meet the following rules in general: The volume of the mixture is 4 ~ 5min (minute) under 30L. The volume of the mixture is 30L - 50L at 5-9min The volume of the mixture is 51L - 75L at 9 ~ 12min After mixing, it is required to do the slump measurement or the specimen forming according to the test requirement. The total operation must be completed in 30min from the beginning of the addition of water.Mechanical agitation First, it is the first batch, which is to make the ripper first, so as not to affect the mixing ratio of the mix. Start the mixer, blender, in turn, to join the gravel, sand and cement, stir evenly, add the water slowly again, all charging time not more than 2 min, water after all to join, to continue mixing 2 min.
Q:Does it affect the ease of mixing too long?
Are now using concrete products, easy to control the quality, intensity can be measured, can also add additive, etc., only their own building the in-situ mixing, transportation for a long time will affect the workability, so the project will adopt water mud and water reducing agent, etc.
Q:What is the driving license for a concrete mixer truck?
B2, you can do it directly. But it must be 21 years old and must be taught in permanent residence. The temporary residence is limited to the C series. The tuition fee for Beijing is 2,800 to 3100.
Q:Is it possible to mix the concrete in a mixing truck for eight hours?
When the concrete is removed from the mixture, it is best not to exceed 150min according to the temperature. But now with the development of the additive technology, and high performance concrete initial setting time and perhaps even control to 13-15 hours (Shanghai world financial center base raft concrete). You can discriminate in this way. Concrete stirred 8 hours, not casual water, workability change is not very big, can use, but 1 can back, part of discharge, stir some higher than the another two grades of concrete, quick stir for a few minutes and pouring into the part or not is not very important part of the bearing. According to the admixture, add admixtures, whisk for 3-4min, and reduce the use of one or two grades. If you have added a lot of water to the site, there has been a significant change in the ease of use.
Q:How did the concrete agitate the concrete
When pouring into the mixing building, the two sides of the car are equal to the stirring bracket, and the first time the mouth is made a mark, so that the next time it will be successful!
Q:What is the purpose of the concrete mixer
It is the delivery of concrete!!! During the shipment, the tank continuously rotates and prevents concrete from solidifying. Once delivered, the concrete can be poured into the pump to get the concrete where it needs to be.
Q:What is the car for concrete
It is called mixer truck concrete mixer truck There are also some people called muck mixer truck
Q:How does the concrete mixing truck work?
Working principle is that by taking power device to take out car chassis power, and drive hydraulic system of the variable pump, the mechanical energy into hydraulic energy to quantitative motor, motor and drive reducer, driven by speed reducer mixing plant, for mixing concrete
Q:What are the three main parts of the concrete mixer car
Oil pump, motor, speed reducer... Please do not hesitate to adopt
Q:How many cars do you have for a concrete tanker
See how much you pack 6 to 9 square and have more

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range