• 1500kg Articulated Front End Wheel Loader System 1
  • 1500kg Articulated Front End Wheel Loader System 2
  • 1500kg Articulated Front End Wheel Loader System 3
1500kg Articulated Front End Wheel Loader

1500kg Articulated Front End Wheel Loader

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick details:

Condition: New

Model Number: 930D

Place of Origin: Shandong, China (Mainland)

Type: Front Loader

Moving Type: Wheel Loader

Dimension(Long * Breadth * High):5900*2100*2970mm

Rated Load: 1500kg

Certification: CE, ROPS/FOPS

Warranty: 8 months

After-sales Service Provided: Engineers available to service machinery overseas

color: yellow, red, black as u need


our advantage:

1.Installation Services

Installation Services are available with all new machine purchases. We will provide the technical know-how for your operation smooth transition and support for installing, debugging, operation of the machine, it will indicate you how to use this machine well.

2.After Sales Service


We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.

Specifications of our products:

1500kg Articulated Front End Wheel Loader

1500kg Articulated Front End Wheel Loader

1500kg Articulated Front End Wheel Loader

1500kg Articulated Front End Wheel Loader

1500kg Articulated Front End Wheel Loader


1500kg Articulated Front End Wheel Loader


FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3. Why choose us?

1.We are professional wheel loader and backhoe loader manufacturer with 10 years experiences in China.

2.Loaders rated load from 600kg to 5000kg and backhoe loader rated load 1200kg.

3.Loaders' color can be yellow, red, green ect, as you like.

4. All of loaders are approved by CE, ROPS/FOPS certification.

5 Delivery time: within 14 days when we have received advance payment.

6. Customers first: Anytime or anywhere or any question i will reply to you as soon as possible.


Q:How long does it take to take out a cylinder of a bulldozer?
Which cylinder? A hydraulic for the blade or the rear PTO? One from the engine? Need more specifics. One of the blade hydraulics is not that long considering it is exposed and on the outside of the machine. Disconnect the hyd lines and undo the bolts and presto it comes off. Then disassemble cylinder and rebuild. So about an hour or a little more for such and the same for rebuild and then reassemble. For the engine a bit more time as getting in and such is not as easy. The Cat or other heavy equipment repair centre will be able to give you farly accurate times for such.
Q:How do bulldozers operate?
The front of the right hand side is a forward push push shovel which is used for controlling the push shovel; the downward pressure is pushed back, and the shovel is pushed upwards; the left and the right are to control the inclination of the push shovel. The ripper is controlled by left and right. The left and right side of the front and rear is to control the throttle, turn and gear needless to say. At the foot is the brake and the idle accelerator. Idle throttle is to step on, the throttle down, the brakes have two, with the general situation on foot, and sometimes when you need to step on the steering wheel, which side of the brakes on the side. Notice that when you go downhill, you must turn on the brakes, or else the turn is reversed
Q:Shantui bulldozer bulldozer and Carter what is the difference?
The Japanese Komatsu Shantui bulldozer technology, the biggest bulldozer and Carter Shantui bulldozer is the difference: Carter high bulldozer, high drive bulldozer chassis technology is Carter's patent, the most mature technology is Carter.
Q:its an old game, maybe 6-7 years old. you move your bulldozer in a grid one step at a time, enemies also move when you do. weapons include bubbles, bombs etc. anyone know what game i'm talking about?
yeah, that buzzy bulldog, the caterpillar game
Q:Read this from ESPN....So..would you advise AJ FOYT to give up driving bulldozers?
No, get back in the saddle and ride again! Go Jr.
Q:Master answer?What is the difference between i73770 and 3770k, which is good?. Is the speed basically the same?My friend suggested that I should have 3770, and now I am very contradictory! Which one do you recommend for 2? Which cost performance, good performance?
2600K compares 2600, is he does not lock, may overclocking you, if does not have the overclocking needs, that does not take K is not differentBulldozer eight nuclear 8150, many tests also come with i5 2500 a level, and power consumption is also big, really disappointing, not recommended to buy
Q:I know you need a different board! Please read the entire question!So I need a new CPU and I have 2 choices, I use my PC for hardcore gaming and a fair bit of video editing. I currently have 8gb RAM and a intel g620 CPUMy choices...Intel i5 2500K = ?159.95or New Mobo + 8gb Ram + AMD Bulldozer 4 core = ?159.57Any ideas?
Unless youre multitasking like a mofo all day go with an i5 In fact, I would actually wait for Ivy Bridge to come out (since its only like 2 days left now). They're supposed to be 7% than Sandy Bridge at about the same price.
Q:i have a socket 775 motherboard is it worth getting an am3+ motherboard and a bulldozer 4 core at 3.6ghz or stick with 775 and get a core 2 quad at 3ghz ?
I'd go with the bulldozer one, since core 2 quads are sort of unreasonably expensive at this point in time, and the price to get a good core 2 quad would be roughly the same as a decent AM3 motherboard and bulldozer processor. However, like the others said, an 1155 socket motherboard and SB processor is a far better option.
Q:Camptown ladies sing dis song,Doodah! doodah! Camptown racetrack five miles long, Oh! doodah day!
What Does Doo Dah Mean
Q:its trying to plow snow. but its not doing a very good job. what, did they run out of regular snowplows or something???
Where are you? If you're in New York that might be the only thing that will move it all.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords