12 Tons TC6036 Tower Crane H3/36B High Quality

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 12 tons

  • Max. Lifting Height: 213.7 m

  • Place of Origin:  China (Mainland)

  • Brand Name: CNBM

  • Model Number: H3/36B

  • Certification: ISO9001, CE Certificate, GOST Certificate

  • After-sales Service Provided: Engineers available to service machinery overseas

 

 

Main Features

 

1) TC6036 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Product Picture

 

12 Tons TC6036 Tower Crane H3/36B High Quality

12 Tons TC6036 Tower Crane H3/36B High Quality

12 Tons TC6036 Tower Crane H3/36B High Quality

12 Tons TC6036 Tower Crane H3/36B High Quality

 

Parameter list

12 Tons TC6036 Tower Crane H3/36B High Quality

 

 

Packaging & Shipping

 

All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.

 

Service


----Providing timely delivery, standby engineers are ready to slove any of your problem

----Providing all-embraced warranty of products quality, worksite installation guidance

----Providing ample spare parts and training of operation and maintenance

----Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When the tower crane top height is more than meters
(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:What is the calibration value of a tower crane?
Tower crane calibration value is to benchmark material to be calibrated by standard liquid titration value, calibration to parallel mark three times, take the average value, if the requirement is not strict, error within 3 per thousand, strictly within 1 per thousand.Main performance parameters of tower crane:1. Lifting weight G1. weight G - was the quality of the heavy lift. The unit is t.2. rated lifting weight Gn allows crane lift weights together with the quality of the sum of the spreader.3. maximum weight Gmax - normal work conditions under the crane, the maximum permissible rated lifting weight lifting.Two, range LL - 1. range of level ground when the crane is positioned between the spreader, no-load vertical center line to the center line of the rotary horizontal distance. The unit is m.2. biggest Lmax - crane, jib angle or the minimum car in arm the limit position of the amplitude.3. Lmin minimum amplitude - jib angle or trolley jib in maximum limit position within the range.
Q:What courses should I take to buy the tower crane to be installed?
First in construction project. When the installation is completed, when it is ready to use, transfer to fixed assets account and make depreciation
Q:In what circumstances should a tower crane be demonstrated by an expert?
Three, lifting and installation, demolition works(1) use of unconventional lifting equipment, methods, and lifting weights of a single piece in excess of 100kN and aboveHeavy lift works.
Q:Ask about the lift and transportation of the jack up tower crane
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:What is a TQ80 tower crane?
A full swing jib crane with a tower type structure, a crane that can travel along the track and is equipped with a full swing arm.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range