12 Meters Electric Type Concrete Placing Boom

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

12 Meters Type Electric Concrete Placing Boom

1.  Structure of 12 Meters Type Electric Concrete Placing Boom

Electric Concrete Placing Boom is newly designed product in order to expand the scope of concrete pouring and improve the mechanization level of pump conveying.

This Manual Concrete Placing Boom with its two fold arms in level folding way are adopted by the boom which is 360° with the characteristics of manual operation, flexible, convenient, safe and reliable.  

The clear height of this machine is 5 m, and particularly applicable to occasions such as the wall, columns with the steel set prominent.

Lightweight, move flexible, and with the mobile place for tower crane to move conveniently.


2.  Main Features of 12 Meters Type Electric Concrete Placing Boom

• Frame arm structure, increasing the loading capacity and stability.

• It has the advantages of high efficiency, energy saving, economy, practicality.

• Double supporting leg, improve the stability and bearing capacity of double

• With excellent steel GB, the Firmness is enhanced several times compared to angle iron

• Electric concrete pouring boom effectively solves the difficulty in wall pouring and successfully reduces labor intensity.

• It has reasonable design, stable and reliable structure. With 360 degree rotation and arm fabric structure, the machine has the advantages of simple operation, flexible rotation.


3.  12 Meters Manual Concrete Placing Boom Images

12 Meters Electric Type Concrete Placing Boom

12 Meters Electric Type Concrete Placing Boom

12 Meters Electric Type Concrete Placing Boom

4. 12 Meters Electric Type Concrete Placing Boom Specification

12 Meters Electric Type Concrete Placing Boom



5. FAQ

We have organized several common questions for our clients,may help you sincerely:

Is your products exported a lot

We have exported to many, many countries. Every year we ship more than 30 containers of these machines & spare parts for it. Our main market is in Middle-east, Asia & Africa.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to fit the cloth rod of the distributor?
With the cable wind rope cloth rod fixed legs, cable wind rope not too tight, the interval should be set aside cloth rod deformation.
Q:What is the concrete distributor?
A composite movement consisting of two parts of a rotating frame covers all cloth radius points
Q:What are the weekly inspection items for concrete spreader?
Check the lubrication situation is good, and timely replenishment of lubricating oil
Q:What's the design plan of the concrete spreader?
The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes. The four section folding telescopic lattice truss fabric tape machine fabric tape machine design for a scalable (multiple) tape machine section four nested truss, by wire rope linkage, telescopic friction wheel and eccentric guide slide
Q:What do concrete pumps and fabrics mean?
Pump truck, sub drag pump and automobile pump, drag pump delivery range is relatively large, the pipe can be used in the past (in the case of pumping pressure allowed), the disadvantage is that relatively cumbersome,
Q:What is the structure of a concrete distributor?
The main frame beam is connected to the front end of a rotary bearing, and the bar, bar before, before the formation of the rotating part, in human pull around the rotary bearing, rotate 300 degrees
Q:what's the difference between the fabric pump and boom pump?
The pump is provided with an automobile chassis, and the distributor is not provided. The distributor is usually installed in a floor or an elevator shaft
Q:What are the acceptance items of concrete spreader?
The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
Q:What are the monthly inspection items of the movable concrete spreader?
Check whether the rotary limiter works properly and check the coupling of the motor
Q:How to maintain the concrete spreader?
The attached vibration motor adopts a special installation structure, which can make the whole surface of the hopper vibrate evenly, break the arch and cut off the material better

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range