110º Pressed Swivel Coupler for Scaffolding Q235 Q345 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of 110º Pressed Swivel Coupler  for Scaffolding

  • Material :SPHC

  • Production Standard :JIS

  • Applications :Construction

  • Package :In bag and pallet


  • Futures of 110º Pressed Double Coupler  for Scaffolding

  • 110º Pressed Swivel Coupler  for Scaffolding Q235 Q345 CNBM

  • 110º Pressed Swivel Coupler  for Scaffolding Q235 Q345 CNBM

  • Scaffolding coupler is the connecting hardware between the steel rail and rail bearing.

  • The Couplers are used to fix the steel rail on rail bearing to keep the rail gauge and prevent their opposite vertical and horizontal movements.

  • The good scaffolding couplers always consider design with less coupler system accessories for easy installation & disassembly.

  • Choose the durable & flexible & high strength couplers can firmly connect the steel rail and rail bearing.

  • Especially recommend the flexible couplers for concrete sleeper moulds application due to enough flexibility requirement from concrete sleeper

  • Our scaffolding couplers are with dual anti-rust processing (deactivation & galvanizing) for a longer lifespan compared to the common couplers.

  •  

  • Adapting full steel plate with cold press molding, our scaffolding couplers are with advanced structure design.All scaffolding couplers are with very high strength & toughness much higher than international general coupler standards. They totally eliminated the safe hazard compared to common iron casted couplers which easily cause the safe hazard due to scaffolding system collapsing accidents resulted by coupler fracture.

  • Our scaffolding couplers with superior stability & high load bearing capacity are popularly used in various construction/engineering applications.

  • The low-cost  scaffolding couplers overcome the point & line fitting problems between couplers and tubes due to the Max Joint Area and cause no safe hazard resulted by steel tube slip. Greatly reinforced the mechanical properties & safety to the scaffolding and prolong the couplers lifespan.


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for the sampling inspection of scaffolding?
1 the sampling proportion of various structural parts shall not be less than 5% and not less than 20 pieces, and the quality shall comply with the relevant standards and regulations. Not meet the quality requirements of the structural parts shall not be used.2 wall thickness of steel pipe should be in line with the provisions of the special construction program, and shall not be less than 2.8mm, the wall thickness of less than 2.8mm of the steel pipe shall not be used;3 is strictly prohibited the use of cracks, deformation of the fastener, the bolt appears to be replaced silk;4 foot hand frame accessories must be used before the anti-corrosion treatment.
Q:In the Scarlet Letter, how does the scaffold scene free Dimmesdale, Hester and Pearl?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q:What are the requirements for the construction of the scaffold eye in the building?
Optimistic, the most comprehensive!5.2.5 scaffold EngineeringA. accessories(1) selection and calculation basis of structural parts
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
Had a hooker climb up the ladder to the 3ed floor one time....didn't stay long though!
Q:Mobile scaffolding accessories prices
! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
Q:Bowl buckle scaffold inspection and evaluation
1 main components should have product identification and product quality certificate.2 the supplier shall provide the material, product inspection report of the pipe, parts, casting, stamping parts and so on.
Q:What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:How to calculate the vertical force of scaffolding
First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
Q:Scaffold Piercing Aftercare?
I've had my industrial for over two years, it's a great piercing but aftercare is important and it does take awhile for it to heal. Here was my schedule for my industrial and all of my piercings since then... When I got my industrial I was in school until about 4 pm as well (I'm no longer in school now so I do it a little differently now) so this schedule might be doable for you. I took showers in the morning but that's not a huge problem. I'd wake up in the morning and while showering I'd clean my piercing with antibacterial soap AFTER I washed my hair and did my other shower rituals. Then when I got out of the shower I would do a short sea salt soaks (sea salt soaks are going to be much better for your piercing than H2O). I'd mix non-iodized sea salt in a clean new dixie cup with warm water, then I'd bend over and let my ear soak in the water for about five minutes. Sea salt soaks are great because they help promote healing and prevent/clean up infections. Then I'd go to school and after school I'd do a simple little rinse with a saline solution (which you can buy at any grocery store, usually around the contact supplies). Saline is good for when you're in a rush and don't have time to do a sea salt soak. Then at night I'd do a long sea salt soak and I'd soak my ear for about 10-15 minutes. Now for you, since you shower at night I would clean my ear with antibacterial soap every night in the shower and do a long sea salt soak after my shower, before bed. Then in the morning I'd so a short little sea salt soak before school and after school you can use a saline solution or the H2O. Good luck! This worked for me with all 6 of my piercings.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range