100Led Christmas Light

Ref Price:
$1.03 - 10.30 / pc
Loading Port:
Ningbo
Payment Terms:
L/C,T/T
Min Order Qty:
100 Pieces pc
Supply Capability:
60000 Pieces pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

General Introduction

100Led Christmas Light

 

Specification
1. Rice bulb amount: 100 PCS

2. Voltage: 220V--240V, and we also can produce 12V, 24V, 110V

3. Certification: CE,RoHS &SAA
4. String Length: 10 meters , and we can produce them in 5meter, 20meter, 30meter, 40meter , 50meter and 60meter.
5. Light Spacing: 10 cm
6. Wire Color: White, green, black, trawberry wires, rubber wire etc.
7. Light Color: White, red, green, blue, yellow, purple, pink ect.
8. Bulb shells made of durable plastic for bad-weather and strong Pressure.
9. Outdoor & Indoor use, full waved rectified.

10. Life span: 25000 hours.
11. If one bulb burns out, the others stay lit. 

 

Product display

Different color

  

Customized Service

1, any wire length is available:  ( 5m, 10m,20m,30m,40m,50,60m)

2, lower Voltage available: ( 12V,24V, 110V, 220V,230V,240V)

3, many wire color available:( black, white, white, black, blue or crystal color)

4, any kind of plug are available: ( America plug, Australia plug, EU plug, UK plug)

 

 Safty instrustions

  • Use this product only with the transformer supplied.

  • Do not connect directly to the mains without a transformer

  • This product can be used Indoor and Outdoor, but please make sure the thansformer is plugged into the mains supply indoors, not outdoors,or in damp conditions.

  • Turn off the power before installment, don't touch the surface of the lights when light on

  • Please make sure using in the normal environment

  • To avoid using nearby the hot or heat source place,where has the corrosive gas.

  • Do not touch or/and knock the product body during working

  • Lamps are not replaceable.

  • The cable of this product can not be replaced.

 

Packaging & Delivery

 

Package:

1pcs per color box.

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

By sea

30-40 business days

1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.

2. "Business days" means Monday-Friday, excluding holidays.

3. DHL and UPS cannot ship to military or P.O. boxes address.

4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the main points of power distribution and lighting energy-saving supervision?
verification of thermal insulation materials used for curtain wall energy saving projects, the thermal conductivity, density and combustion performance shall comply with the design requirements.
Q:What are the main technical measures for the implementation of energy-saving lighting?
The most basic principle is that different light sources should be chosen according to different places.
Q:CREE semiconductor lighting pay no
In case of holidays or rest days, you should pay in advance on the most recent working days. Wages shall be paid at least once a month, and wages paid by week, day and hour shall be paid by week, day and hour.
Q:About the brightness of LED lighting
The first is the internal circuit problem. 1 Section 7 should use constant current drive circuit.
Q:What is lighting energy-saving?
Lighting energy-saving mainly through the use of energy-efficient lighting products, improve quality, optimize lighting design and other means to achieve the benefit of the purpose, that is, energy conservation, but not sacrifice quality.
Q:The festival lights are strung together by a number of small light bulbs connected to the lighting circuit
the lighting voltage is 220V, 10 "12V, 10W" series connected to the lighting circuit,
Q:Does the lighting for the workshop use energy-saving lamps or LED lights?.
it is easy to damage, short life, energy saving, not saving money, this sentence is the best portrayal of it.
Q:What are some good suggestions for plant energy saving lighting modification?
the theory of life can reach 50000 hours, to the factory lighting energy saving renovation has brought great benefit.
Q:What is the color temperature of a star hotel?
entrance channel lighting leads the vehicle safely to the entrance.
Q:Building lighting in lighting, lighting should pay attention to what details?
Building lighting needs to consider the problem, should choose the appropriate lamps and lanterns lighting, in general, square light distribution angle is larger, round lamp angle is smaller.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range