0ZYC1200Hydraulic Static Pile Driver for Sale

Ref Price:
$200,000.00 - 500,000.00 / unit
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ZYC1200Hydraulic Static Pile Driver for Sale

 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 


 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 


 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 


 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 


 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 


 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 


 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 


 


Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.


Parameter/ModelZYC1200
Rate piling pressure(KN)12000
Piling speed(m/min)Fast6.0
Low1.0
Piling stroke(m)1.9
Pace(m)Longitudinal3.6
Horizontal0.6
Angle range(°)8
Rise stroke(m)1.2
Square pile(mm)Max600
Circle pile(mm)Max800
Side piling(mm)1600
Corner piling space(mm)3200
Lifting weight(t)25
Pile hanging length(m)15
Power(KW)Piling165
Lifting37
Main dimension(m)Work length16
Work width9.2
Transpot height3.40
Total weight(t)1200

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the parts of a pile driver?
The hammer into the exhaust valve reversing by manual control, can also be installed in the side with the hammer and hammer lifting flange lever automatic control, impact stroke two ways can adjust the hammer. Three diesel hammer body is made of cylinder and piston, similar to the working principle and the single cylinder two stroke diesel engine into the cylinder combustion under high temperature and high pressure atomized diesel combustion chamber by injection pressure generated by the detonation driven hammer working. According to the structural form of diesel hammer rod and cylinder type separation. The guide rod type diesel hammer is pressed on the pile cap with a plunger as a hammer seat, and the cylinder is used as a hammer head to move up and down along the two guide rods. When in operation, the pile hanging in place pile frame in Longmen, then put the diesel hammer at the top of the pile, the hook will lift down the cylinder, and the cylinder sleeve off hook to the whereabouts of the piston, the cylinder will be closed in the air compression cylinder rocker pin until the pressure continues to fall outside the cylinder pushing hammer on the base of the fuel pump, fuel pump will be injected into the cylinder oil mist, oil mist meet high temperature gas burning immediately above, blasting, explosive shock down pile., to push the cylinder to cylinder to rise, fall along the guide rod, and the beginning of the second impact cycle. The cylinder type diesel hammer takes the cylinder as the hammer seat and directly uses the lengthened cylinder to guide the inner wall.
Q:Do you make money on building pile drivers? How long will it take to recover the cost?
To be honest, no money, no problem, it's hard to have a client.My father worked as an electrician at the construction site for three years. I just asked him.Of course, you have connections, and you won't do it.The most crucial thing is the network, there is a market, that thing good, tens of millions, smashing hands, crying dead.Sure, you have connections, when I don't say..
Q:The ground site must be driven by a pile driver
Look, what's your base like?... If it's high-level. Just use it... Now the general use of super flow too... There are also not common are prefabricated piles, artificial dig hole pile, pipe sinking filling pile, spiral bored pile, powder spray pile.
Q:Precast pile, artificial dig hole pile, sinking pipe filling pile, spiral drilling pouring pile and powder spraying pile.
This needs to see you later there is no project, and later works can consider buying.Of course, a comparison can be made between purchase and lease before purchase.
Q:What is the specific working principle of the 80 type pile driver?
The main principle that piling machine is generally more vibration hammer (this principle is nothing more than the vibrations make the hydraulic tubing sinking) not used but the price too high maintenance trouble this hour how many meters are not counted nor so counted are generally by 10 meters with a 20 meters as a count this time the specific time depends on the formation of me is to do this to give you about what you do this mainly before entering the first to see money does not receive this is mainly engaged in engineering for the most difficult access fee second third of total output value (and you probably under a mechanical maintenance personnel piling machine is very easy to go wrong) the fourth is the very important geological prospecting (some strata such as large pebbles etc.
Q:Piling machines need to how much money??
Hello, this is not necessarily, because the configuration is not the same, so the charge is not the same!
Q:In the construction project, the pile driver can not be reached. What should the supervisor do?
Contact design and geological prospecting personnel to the scene examination, to determine the final plan.
Q:A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
A screw driver pile diameter 400mm depth of not less than 12 meters, 24 hours a day non-stop, how much can be hit?
Q:Which manufacturer is better for highway guardrail and pile driver?
There are many manufacturers of pile drivers now. Do you buy them online or offline?
Q:The CPU for evaluating AMD is called bulldozer,
Bulldozers and pile drivers are the English translation of a new framework introduced by AMD two years ago and last year. The original name is "Bulldozer architecture". Literally, it means "bulldozer". Piling machine is the second generation of bulldozer, and also literal translation. It has nothing to do with good or bad.There's nothing wrong with the power consumption of the bulldozer architecture, so it's easy to have bad associations with the bulldozer, and nothing else.The performance of bulldozer is equivalent to the core I3 series processors core I5 to this level.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range